NOGRR082  Synchronization with NPRR258 and Alignment of Primary Frequency Response Test Procedures

Approved Urgent sponsor ERCOT posted 2011-10-07 ercot.com
ReasonUpon implementation of NPRR258, Protocol Section 8.1.1.4.1, Regulation Service and Generation Resource/Controllable Load Resource Energy Deployment Performance, ERCOT will use High Sustained Limit (HSL) for calculating Estimated Primary Frequency Response (EPFR) which is a component of Generation Resource Energy Deployment Performance (GREDP) calculation. This NOGRR will align the EPFR requirement with how the test shall be conducted for IRRs since IRRs can have significant difference between installed capacity and HSL.
Created2011-11-10
Sections Affected
8C
Summary
This Nodal Operating Guide Revision Request (NOGRR) synchronizes the Nodal Operating Guides with Nodal Protocol Revision Request (NPRR) 258, Synchronization with PRR824 and PRR833 and Additional Clarifications, and revises the frequency response test procedure to be applicable to Intermittent Renewable Resources (IRRs).
Action Log 2 milestones
Documents 5
NameTypePostedClassification
082NOGRR-01 Synchronization with NPRR258 and Updates to Frequenc doc Oct 7 '11 Revision Request
082NOGRR-02 Impact Analysis 100711 doc Oct 7 '11 Staff Report
082NOGRR-03 PDCWG Comments 110911 doc Nov 9 '11 Revision Request Comments
082NOGRR-04 ROS Report 111011 doc Nov 14 '11 Committee Report
082NOGRR-05 TAC Report 120111 doc Dec 5 '11 Committee Report
Meetings That Took It Up 3
DateMeetingCommitteeStatus
Dec 1 '11 TAC Meeting TAC Concluded
Nov 10 '11 ROS Meeting ROS Concluded
Oct 19 '11 Operations Working Group (OWG) Meeting OWG Concluded