ERCOT·WATCH Search ercot.com  ⌕
NOGRR #164 · Revision Request

NOGRR164  Alignment with NPRR792, Removing Special Protection System (SPS) and adding Remedial Action Scheme (RAS)

Approved Urgent sponsor ERCOT posted 2016-07-27 ercot.com
ReasonRegulatory Requirements
Created2016-08-18
Sections Affected
2.2.72.9.13.2.34.3.16.2.31111.111.211.2.111.311.3 (new)11.411.411.6Section 8 Attachment K (new)
Summary
This Nodal Operating Guide Revision Request (NOGRR) aligns the Operating Guides with North American Electric Reliability Corporation (NERC) Reliability Standard definition for Special Protection System (SPS) and for consistency uses Remedial Action Scheme (RAS) and Automatic Mitigation Plan (AMP) where applicable in place of SPS. This NOGRR also adds a RAS template to simplify submitting new and modified RASs.
Action Log 5 milestones
Amendments
DateBodyMotionResult
Sep 22 '16OWG To recommend approval of NOGRR164 as amended by the 9/21/16 Austin Energy comments as revised by OWG.Passed
Ballots
DateBodyResultYesNoAbstain
Dec 15 '16 TAC Motion Passes 20 0 0 xls
Documents 10
NameTypePostedClassification
164NOGRR-01 Alignment with NPRR Changing Special Protection System (SPS) to Remedial Action Scheme (RAS) doc Jul 27 '16 Revision Request
164NOGRR-02 Impact Analysis 072716 doc Jul 27 '16 Staff Report
164NOGRR-03 OWG Report 081816 doc Aug 23 '16 Committee Report
164NOGRR-04 ERCOT Comments 091916 docx Sep 19 '16 Revision Request Comments
164NOGRR-05 Austin Energy Comments 092116 docx Sep 22 '16 Revision Request Comments
164NOGRR-06 OWG Report 092216 doc Sep 27 '16 Committee Report
164NOGRR-07 ROS Report 100616 docx Oct 10 '16 Committee Report
164NOGRR-08 TAC Report 102716 doc Nov 1 '16 Committee Report
164NOGRR-09 TAC Email Vote 121516 xls Dec 16 '16 Revision Request Ballot
164NOGRR-10 TAC Report 121516 docx Dec 20 '16 Committee Report
Meetings That Took It Up 6
DateMeetingCommitteeStatus
Dec 15 '16 TAC Email Vote re NOGRR164 TAC Concluded
Dec 1 '16 TAC Meeting TAC Concluded
Oct 27 '16 TAC Meeting TAC Concluded
Oct 6 '16 ROS Meeting ROS Concluded
Sep 22 '16 OWG Meeting OWG Concluded
Aug 18 '16 OWG Meeting OWG Concluded