NOGRR #30 · Revision Request
NOGRR030 Synchronization -- Total Transmission Capacity Correction
- ROS Sep 10 '09
- TAC Oct 1 '09
- BOARD —
- PUCT —
ReasonTotal Transfer Capability, as defined by NERC, does not apply to the ERCOT Region since there is only one transmission system. Total Transmission Capacity is the comparable ERCOT terminology, but the two acronyms are used interchangeably throughout the ERCOT Nodal Operating Guides. This may cause ERCOT to appear to be out of compliance with NERC Reliability Standards, when compliance has actually been achieved, or the requirement is not applicable to ERCOT.
Created2009-09-10
Sections Affected
3.9.4
Summary
This Nodal Operating Guide Revision Request (NOGRR) replaces the acronym Total Transfer Capability (TTC) with Total Transmission Capacity (TTC).
Timeline
- Sep 3
-
Sep 10
ROS ROS MeetingROSRecommended for Approval“To recommend approval of NOGRR030 as submitted” — Passed→ TAC Consideration
-
Oct 1
TAC TAC MeetingTACApproved Amended by the Sep 24 '09 ERCOT comments“To approve NOGRR030 as amended by the 9/24/09 ERCOT comments” — Passed
-
—
Posted since the last meeting