NOGRR030 Synchronization -- Total Transmission Capacity Correction
ReasonTotal Transfer Capability, as defined by NERC, does not apply to the ERCOT Region since there is only one transmission system. Total Transmission Capacity is the comparable ERCOT terminology, but the two acronyms are used interchangeably throughout the ERCOT Nodal Operating Guides. This may cause ERCOT to appear to be out of compliance with NERC Reliability Standards, when compliance has actually been achieved, or the requirement is not applicable to ERCOT.
Created2009-09-10
Sections Affected
3.9.4
Summary
This Nodal Operating Guide Revision Request (NOGRR) replaces the acronym Total Transfer Capability (TTC) with Total Transmission Capacity (TTC).
Action Log 2 milestones
-
Sep 10
ROSRecommended for Approval→ TAC Consideration
-
Oct 1
TACApproved
Amendments
| Date | Body | Motion | Result |
|---|---|---|---|
| Oct 1 '09 | TAC | To approve NOGRR030 as amended by the 9/24/09 ERCOT comments | Passed |
Documents 7
| Name | Type | Posted | Classification |
|---|---|---|---|
| 030NOGRR-01 Synchronization - Total Transmission Capacity Correc | doc | Sep 3 '09 | Revision Request |
| 030NOGRR-02 Impact Analysis 090309 | doc | Sep 3 '09 | Staff Report |
| 030NOGRR-03 CEO Revision Request Review 090309 | doc | Sep 3 '09 | Committee Report |
| 030NOGRR-04 Urgency Vote 091009 | xls | Sep 10 '09 | Revision Request Ballot |
| 030NOGRR-05 ROS Recommendation Report 091009 | doc | Sep 14 '09 | Committee Report |
| 030NOGRR-06 ERCOT Comments 092409 | doc | Sep 24 '09 | Revision Request Comments |
| 030NOGRR-07 TAC Action Report 100109 | doc | Oct 2 '09 | Committee Report |
Meetings That Took It Up 2
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Oct 1 '09 | TAC Meeting | TAC | Concluded |