Approved Urgent sponsor ERCOT posted 2009-09-03 ercot.com
ReasonTotal Transfer Capability, as defined by NERC, does not apply to the ERCOT Region since there is only one transmission system. Total Transmission Capacity is the comparable ERCOT terminology, but the two acronyms are used interchangeably throughout the ERCOT Nodal Operating Guides. This may cause ERCOT to appear to be out of compliance with NERC Reliability Standards, when compliance has actually been achieved, or the requirement is not applicable to ERCOT.
Created2009-09-10
Sections Affected
3.9.4
Summary
This Nodal Operating Guide Revision Request (NOGRR) replaces the acronym Total Transfer Capability (TTC) with Total Transmission Capacity (TTC).
Action Log 2 milestones
Amendments
DateBodyMotionResult
Oct 1 '09TAC To approve NOGRR030 as amended by the 9/24/09 ERCOT commentsPassed
Documents 7
NameTypePostedClassification
030NOGRR-01 Synchronization - Total Transmission Capacity Correc doc Sep 3 '09 Revision Request
030NOGRR-02 Impact Analysis 090309 doc Sep 3 '09 Staff Report
030NOGRR-03 CEO Revision Request Review 090309 doc Sep 3 '09 Committee Report
030NOGRR-04 Urgency Vote 091009 xls Sep 10 '09 Revision Request Ballot
030NOGRR-05 ROS Recommendation Report 091009 doc Sep 14 '09 Committee Report
030NOGRR-06 ERCOT Comments 092409 doc Sep 24 '09 Revision Request Comments
030NOGRR-07 TAC Action Report 100109 doc Oct 2 '09 Committee Report
Meetings That Took It Up 2
DateMeetingCommitteeStatus
Oct 1 '09 TAC Meeting TAC Concluded
Sep 10 '09 ROS Meeting ROS Concluded