| PGRR133 ! Clarifying Legacy Generation Breaker Control for PGRR115 Implementation |
Vistra |
Approved |
Oct 30 '25 |
Jul 9 '26 |
| PGRR143 Steady State Planning Schedule Posting Location Update |
ERCOT |
Approved |
Feb 17 '26 |
Jul 9 '26 |
| PGRR144 Dynamic Model Submission and Review Requirements for Large Loads including Large Computational Loads |
ERCOT |
ROS for Impact Analysis consideration (ROS) |
Feb 18 '26 |
Jul 9 '26 |
| PGRR145 ! Batch Zero Process for Large Load Interconnections |
ERCOT |
Approved |
Mar 4 '26 |
Jun 18 '26 |
| PGRR123 Related to NPRR1264, Creation of a New Energy Attribute Certificate Program |
Texas Energy Buyers... |
Revision Request Consideration (TAC) |
Dec 19 '24 |
Jun 4 '26 |
| PGRR128 Regional Planning Group Discussion of Grid Enhancing Technologies |
TEBA |
Impact Analysis (ROS) |
Jun 12 '25 |
Jun 4 '26 |
| PGRR146 Rename Quarterly Stability Assessment and Modify the Assessment Schedule |
ERCOT |
Language Consideration (ROS) |
May 20 '26 |
Jun 4 '26 |
| PGRR147 Allowable Non-Consequential Load Loss Alignment |
Rayburn Country... |
Language Consideration (ROS) |
May 20 '26 |
Jun 4 '26 |
| PGRR139 Related to NPRR1314, Planning Guide Glossary Transition |
ERCOT |
Approved |
Dec 16 '25 |
May 29 '26 |
| PGRR127 Addition of Proposed Generation to the Planning Models |
ERCOT |
Approved |
May 30 '25 |
Mar 26 '26 |
| PGRR132 Update to Standard Generation Interconnection Agreement (SGIA) Requirement |
ERCOT |
Approved |
Oct 1 '25 |
Mar 26 '26 |
| PGRR142 In-kind Definition for Generation |
Invenergy |
Language Consideration (ROS) |
Jan 28 '26 |
Mar 5 '26 |
| PGRR141 Large Load Interconnection Study Reform for Substantiated Load |
Joint Sponsors |
Withdrawn |
Dec 31 '25 |
Feb 5 '26 |
| PGRR131 ! Requirements for Interconnection Cost Reporting for Transmission-Connected Generators |
ERCOT |
Approved |
Aug 26 '25 |
Jan 15 '26 |
| PGRR137 Administrative Change for Planning Guide – NPRR1298 |
ERCOT |
Approved |
Nov 25 '25 |
Jan 15 '26 |
| PGRR136 Large Load Interconnection Study Scope Documentation |
Schaper Energy Consulting |
Withdrawn |
Nov 25 '25 |
Jan 8 '26 |
| PGRR138 Large Load Interconnection Study Review and Approval Process |
Schaper Energy Consulting |
Withdrawn |
Dec 1 '25 |
Jan 8 '26 |
| PGRR140 Related to NPRR1317, Creation of Non-Settled Generator (NSG) and Clarification of the Types, Usage, and Registration of Distributed Generation |
ERCOT |
ROS for consideration (ROS) |
Dec 19 '25 |
Jan 8 '26 |
| PGRR134 Interconnection Studies Reform for Dispatchable Loads |
Luminary Strategies |
Withdrawn |
Nov 1 '25 |
Dec 4 '25 |
| PGRR120 SSO Risk Reduction for Generator Interconnection |
ERCOT |
Approved |
Oct 14 '24 |
Nov 6 '25 |
| PGRR121 ! Related to NOGRR272, Advanced Grid Support Requirements for Inverter-Based ESRs |
ERCOT |
Approved |
Oct 31 '24 |
Nov 6 '25 |
| PGRR129 Establish Grid Reliability and Resiliency Assessment (GRRA) Posting Requirements |
ERCOT |
Approved |
Jun 25 '25 |
Nov 6 '25 |
| PGRR135 Large Load Interconnection Queue Process Revision |
Cholla Petroleum |
Withdrawn |
Nov 4 '25 |
Nov 4 '25 |
| PGRR130 Related to NPRR1295, GTC Exit Solutions |
Joint Sponsors |
Language Consideration (ROS) |
Aug 19 '25 |
Sep 11 '25 |
| PGRR125 ! Update of LSIPA Compliance Attestation |
ERCOT |
Approved |
Mar 25 '25 |
Jul 31 '25 |
| PGRR126 Related to NPRR1284, Guaranteed Reliability Load Process |
Cholla Petroleum |
ROS for consideration (ROS) |
May 12 '25 |
Jun 5 '25 |
| PGRR115 Related to NPRR1234, Interconnection Requirements for Large Loads and Modeling Standards for Loads 25 MW or Greater |
ERCOT |
Approved |
May 28 '24 |
May 15 '25 |
| PGRR119 Stability Constraint Modeling Assumptions in the Regional Transmission Plan |
ERCOT |
Approved |
Sep 9 '24 |
May 15 '25 |
| PGRR117 Addition of Resiliency Assessment and Criteria to Reflect PUCT Rule Changes |
ERCOT |
Approved |
Jul 17 '24 |
Mar 13 '25 |
| PGRR118 Related to NPRR1246, Energy Storage Resource Terminology Alignment for the Single-Model Era |
ERCOT |
Approved |
Jul 31 '24 |
Mar 13 '25 |
| PGRR124 ESR Maintenance Exception to Modifications |
Tesla |
Language Consideration (ROS) |
Feb 7 '25 |
Mar 6 '25 |
| PGRR107 Related to NPRR1180, Inclusion of Forecasted Load in Planning Analyses |
Oncor |
Approved |
May 11 '23 |
Jan 16 '25 |
| PGRR116 Related to NPRR1240, Access to Transmission Planning Information |
ERCOT |
Approved |
Jul 2 '24 |
Jan 16 '25 |
| PGRR122 Reliability Performance Criteria for Loss of Load |
ERCOT |
ROS for consideration (ROS) |
Nov 11 '24 |
Dec 5 '24 |
| PGRR106 Clarify Projects Included in Transmission Project Information and Tracking (TPIT) Report |
ERCOT |
Approved |
Apr 19 '23 |
Sep 26 '24 |
| PGRR112 Dynamic Data Model and Full Interconnection Study (FIS) Deadline for Quarterly Stability Assessment |
ERCOT |
Approved |
Sep 20 '23 |
Jul 25 '24 |
| PGRR113 Related to NPRR1198, Congestion Mitigation Using Topology Reconfigurations |
ERCOT |
Approved |
Nov 14 '23 |
Jul 25 '24 |
| PGRR114 Related to NPRR1212, Clarification of Distribution Service Provider’s Obligation to Provide an ESI ID |
ERCOT |
Approved |
Nov 22 '23 |
Jul 25 '24 |
| PGRR105 Deliverability Criteria for DC Tie Imports |
Rainbow Energy... |
Withdrawn |
Apr 17 '23 |
May 22 '24 |
| PGRR109 Dynamic Model Review Process Improvement for Inverter-Based Resource (IBR) Modification |
ERCOT |
Approved |
Jul 18 '23 |
Apr 11 '24 |
| PGRR110 Revision to Accommodate Steady-State Node-Breaker Modeling |
ERCOT |
Approved |
Jul 19 '23 |
Feb 1 '24 |
| PGRR103 Establish Time Limit for Generator Commissioning Following Approval to Synchronize |
ERCOT |
Approved |
Dec 21 '22 |
Oct 12 '23 |
| PGRR108 Related to NPRR1183, ECEII Definition Clarification and Updates to Posting Rules for Certain Documents without ECEII |
ERCOT |
Approved |
May 24 '23 |
Oct 12 '23 |
| PGRR111 Related to NPRR1191, Registration, Interconnection, and Operation of Customers with Large Loads; Information Required of Customers with Loads 25 MW or Greater |
ERCOT |
Withdrawn |
Aug 1 '23 |
Sep 7 '23 |
| PGRR104 ! Related to NPRR1157, Incorporation of PUCT Approval into Revision Request Process |
ERCOT |
Approved |
Feb 22 '23 |
May 11 '23 |
| PGRR102 Dynamic Operation Model Improvement |
ERCOT |
Approved |
Oct 21 '22 |
Mar 23 '23 |
| PGRR101 Related to NPRR1133, Clarify Responsibilities for Submission of Planning Model Data for DC Ties |
ERCOT |
Approved |
May 6 '22 |
Sep 15 '22 |
| PGRR100 Steady-State Case Building Timeline Update |
CenterPoint Energy |
Approved |
Nov 29 '21 |
Jul 14 '22 |
| PGRR096 Achieve Consistent Representation of Distributed Generation in Steady-State Models |
ERCOT |
Approved |
Sep 22 '21 |
May 12 '22 |
| PGRR098 Consideration of Load Shed in Transmission Planning Criteria |
LCRA |
Approved |
Nov 8 '21 |
May 12 '22 |
| PGRR095 Establish Minimum Deliverability Criteria |
ERCOT |
Approved |
Aug 26 '21 |
Mar 31 '22 |
| PGRR099 Revise GIM Process to Ensure Compliance with the Lone Star Infrastructure Protection Act |
ERCOT |
Approved |
Nov 17 '21 |
Mar 31 '22 |
| PGRR092 Related to NPRR1077, Extension of Self-Limiting Facility Concept to Settlement Only Generators (SOGs) and Telemetry Requirements for SOGs |
ERCOT |
Approved |
May 19 '21 |
Dec 16 '21 |
| PGRR097 Related to NPRR1098, Direct Current Tie (DC Tie) Reactive Power Capability Requirements |
ERCOT |
Withdrawn |
Sep 29 '21 |
Nov 4 '21 |
| PGRR093 Replace Inadvertent Deletions in Section 5 |
ERCOT |
Approved |
Jun 23 '21 |
Oct 28 '21 |
| PGRR094 Clarify Notification Requirement for Generator Construction Commencement or Completion |
ERCOT |
Approved |
Jul 21 '21 |
Oct 28 '21 |
| PGRR089 Planning Data and Information Updates for Planning Posting |
ERCOT |
Approved |
Mar 17 '21 |
Aug 19 '21 |
| PGRR091 FIS Application Completion 60-Day Limit |
ERCOT |
Approved |
May 18 '21 |
Aug 19 '21 |
| PGRR090 Additional Flexibility for Updates to Seasonal Net Max Sustainable Rating |
Temple Generation I |
Rejected |
Apr 22 '21 |
Jul 8 '21 |
| PGRR088 Include Financial Security Amount in the Monthly Generator Interconnection Status Report |
Reliant |
Approved |
Sep 28 '20 |
Jun 8 '21 |
| PGRR085 Dynamic Model Improvements |
ERCOT |
Approved |
Sep 16 '20 |
Feb 9 '21 |
| PGRR086 Related to RRGRR027, Clarify Models Required to Proceed with an FIS |
Enel Green Power... |
Approved |
Sep 18 '20 |
Feb 9 '21 |
| PGRR087 Remedial Action Scheme Planning Assumptions |
ERCOT |
Approved |
Sep 23 '20 |
Feb 9 '21 |
| PGRR081 Related to NPRR1026, BESTF-7 Self-Limiting Facilities |
ERCOT |
Approved |
Jun 4 '20 |
Dec 8 '20 |
| PGRR082 Revise Section 5 and Establish Small Generation Interconnection Process |
ERCOT |
Approved |
Jun 30 '20 |
Dec 8 '20 |
| PGRR083 Add RPG Project Number and TPIT Revisions |
ERCOT |
Approved |
Jul 1 '20 |
Dec 8 '20 |
| PGRR084 Related to NPRR1039, Replace the Term MIS Public Area with ERCOT Website |
ERCOT |
Approved |
Aug 18 '20 |
Dec 8 '20 |
| PGRR077 DC Tie Planning Assumptions |
ERCOT |
Approved |
Jan 8 '20 |
Oct 13 '20 |
| PGRR074 Related to NPRR973, Add Definitions for Generator Step-Up and Main Power Transformer |
ERCOT |
Approved |
Sep 25 '19 |
Aug 11 '20 |
| PGRR076 Improvements to Generation Resource Interconnection or Change Request (GINR) Process |
ERCOT |
Approved |
Oct 23 '19 |
Aug 11 '20 |
| PGRR078 Market Data Transparency Update for Planning Postings |
ERCOT |
Approved |
Feb 19 '20 |
Aug 11 '20 |
| PGRR079 Related to NPRR1003, Elimination of References to Resource Asset Registration Form |
ERCOT |
Approved |
Feb 26 '20 |
Aug 11 '20 |
| PGRR080 Updated Responsibilities for Performing GMD Vulnerability Assessments |
ERCOT |
Approved |
Apr 22 '20 |
Aug 11 '20 |
| PGRR075 Dynamic Model Quality Requirement |
ERCOT |
Approved |
Oct 22 '19 |
Apr 14 '20 |
| PGRR071 Update Interconnection Process Timetables to Align with NPRR926 |
ERCOT |
Approved |
Jun 19 '19 |
Dec 10 '19 |
| PGRR072 Treatment of Generation Resource Retirement and Mothball in Regional Transmission Plan and Geomagnetic Disturbance Vulnerability Assessment |
ERCOT |
Approved |
Jun 26 '19 |
Oct 8 '19 |
| PGRR073 Related to NPRR956, Designation of Providers of Transmission Additions |
ERCOT |
Language Consideration (ROS) |
Jul 2 '19 |
Aug 8 '19 |
| PGRR069 Related to NPRR921, RTF-2 Elimination of the Terms All-Inclusive Generation Resource and All-Inclusive Resource |
ERCOT |
Approved |
Jan 28 '19 |
Jun 11 '19 |
| PGRR070 Revised Responsibilities for Performing Geomagnetic Disturbance (GMD) Vulnerability Assessments |
ERCOT |
Approved |
Feb 19 '19 |
Jun 11 '19 |
| PGRR065 Transmission Project Information and Tracking (TPIT) Reform |
LCRA Transmission... |
Approved |
May 31 '18 |
Dec 11 '18 |
| PGRR066 Interconnection Request Cancellation and Creation of Inactive Status |
ERCOT |
Approved |
Jun 26 '18 |
Dec 11 '18 |
| PGRR067 Procedures for Wind and Solar Equipment Change |
ERCOT |
Approved |
Jun 26 '18 |
Dec 11 '18 |
| PGRR068 Addition of a Proposed DC Tie to the Planning Models |
ERCOT |
Approved |
Jul 25 '18 |
Dec 11 '18 |
| PGRR063 Transmission Interconnection Study |
ERCOT |
Approved |
Apr 17 '18 |
Oct 9 '18 |
| PGRR064 Transmission Dynamic Element Model Verification |
ERCOT |
Approved |
Apr 18 '18 |
Oct 9 '18 |
| PGRR061 Related to NPRR866, Mapping Registered Distributed Generation and Load Resources to Transmission Loads in the Network Operations Model |
ERCOT |
Approved |
Feb 14 '18 |
Aug 7 '18 |
| PGRR062 Updates to Generation Interconnection or Change Request (GINR) Process |
ERCOT |
Approved |
Mar 21 '18 |
Aug 7 '18 |
| PGRR059 Related to NPRR837, Regional Planning Group (RPG) Process Reform |
ERCOT |
Approved |
Jun 28 '17 |
Jun 12 '18 |
| PGRR060 Clarification of Reliability Performance Criteria |
ERCOT |
Approved |
Feb 14 '18 |
Jun 12 '18 |
| PGRR056 Alignment with NPRR562, Subsynchronous Resonance |
ERCOT |
Approved |
Jan 27 '17 |
Jun 13 '17 |
| PGRR057 Responsibilities for Performing Geomagnetic Disturbance (GMD) Vulnerability Assessments |
ERCOT |
Approved |
Feb 6 '17 |
Jun 13 '17 |
| PGRR058 Clarification of Generation to be Included in the Planning Models |
PLWG |
Approved |
Mar 7 '17 |
Jun 13 '17 |
| PGRR052 Stability Assessment for Interconnecting Generation |
PLWG |
Approved |
Sep 29 '16 |
Apr 4 '17 |
| PGRR054 Stability Limits in the Full Interconnect Study |
PLWG |
Approved |
Nov 15 '16 |
Apr 4 '17 |
| PGRR055 Planning Guide Revision Request Process |
ERCOT |
Approved |
Jan 10 '17 |
Apr 4 '17 |
| PGRR053 Addition of Proposed Generation Resources to the Planning Models |
PLWG |
Approved |
Sep 29 '16 |
Feb 14 '17 |
| PGRR042 Regional Transmission Plan Model Reserve Requirement and Load-Generation Imbalance Methodology |
ERCOT |
Approved |
Feb 5 '15 |
Dec 13 '16 |
| PGRR051 Alignment with NPRR792, Changing Special Protection System (SPS) to Remedial Action Scheme (RAS) |
ERCOT |
Approved |
Jul 27 '16 |
Dec 13 '16 |
| PGRR046 Addition of Geomagnetically Induced Current (GIC) Model Building Requirements |
ERCOT |
Approved |
Feb 26 '16 |
Oct 11 '16 |
| PGRR047 FIS Department of Defense Declaration |
ERCOT |
Approved |
May 11 '16 |
Oct 11 '16 |
| PGRR048 Alignment with NPRR779, Clarifies References to Texas Reliability Entity and Independent Market Monitor |
ERCOT |
Approved |
May 27 '16 |
Oct 11 '16 |
| PGRR049 GINR Application and Fee Submittal |
ERCOT |
Approved |
Jun 7 '16 |
Oct 11 '16 |
| PGRR050 Administrative Changes for the July 1, 2016 Planning Guide – Section 21 Alignment |
ERCOT |
Approved |
Jun 16 '16 |
Jun 16 '16 |
| PGRR045 Alignment with NPRR705, Provides Consistency for References to the End Date of the Generation Interconnection Process |
ERCOT |
Approved |
May 20 '15 |
Dec 8 '15 |
| PGRR043 FIS Scoping Amendment |
E. ON |
Approved |
Apr 6 '15 |
Aug 11 '15 |
| PGRR044 MIS Classification of GINR Study Information |
ERCOT |
Approved |
Apr 29 '15 |
Aug 11 '15 |
| PGRR040 Clarification of Water Supply Rights Attestation Obligation |
ERCOT |
Approved |
Dec 2 '14 |
Jun 9 '15 |
| PGRR041 Revise and Add Requirements for NERC TPL-001-4 Standard |
ERCOT |
Approved |
Dec 2 '14 |
Apr 14 '15 |
| PGRR039 Generation Data for Resource Adequacy and Reliability Reporting |
ERCOT |
Approved |
Jul 28 '14 |
Dec 9 '14 |
| PGRR031 Implement 95% Facility Rating Limit in the Planning Criteria |
PLWG |
Rejected |
Jun 12 '13 |
Aug 12 '14 |
| PGRR036 Planning Market Data Transparency |
ERCOT |
Approved |
Apr 8 '14 |
Aug 12 '14 |
| PGRR038 Require ERCOT to Report Circuits Loaded Above 95% of Their Facility Rating |
ERCOT |
Approved |
May 21 '14 |
Aug 12 '14 |
| PGRR028 Evaluation of Compliance with Reactive Requirements |
ERCOT |
Withdrawn |
Feb 12 '13 |
Jun 5 '14 |
| PGRR037 Administrative Changes for the June 1, 2014 Planning Guide |
ERCOT |
Approved |
May 14 '14 |
May 14 '14 |
| PGRR032 Stakeholder Review of Resource Registration Data Requirements |
Resource Data... |
Approved |
Sep 6 '13 |
Feb 11 '14 |
| PGRR033 Dynamics Flat Start Cases Preparation |
Reza Ebrahimian on... |
Approved |
Sep 23 '13 |
Feb 11 '14 |
| PGRR030 New Planning Guide Section 8A, Declaration of Resource Data Accuracy and 8B, Declaration of Adequate Water Rights (formerly "New Planning Guide Section 8A, Declaration of Resource Data Accuracy") |
ERCOT |
Approved |
May 24 '13 |
Dec 10 '13 |
| PGRR035 DC Tie Interconnection Process |
John Moore on behalf... |
Withdrawn |
Nov 4 '13 |
Nov 22 '13 |
| PGRR029 Deadline for Regional Transmission Plan |
ERCOT |
Approved |
Apr 26 '13 |
Nov 19 '13 |
| PGRR034 Asynchronous Tie Interconnection Process |
Pattern Energy |
Withdrawn |
Oct 8 '13 |
Oct 23 '13 |
| PGRR027 Analysis of Subsynchronous Resonance Studies in Transmission Studies |
ERCOT |
Approved |
Jan 15 '13 |
Jul 16 '13 |
| PGRR025 Addition of Criteria for Autotransformer Unavailability |
PLWG |
Approved |
Nov 2 '12 |
May 14 '13 |
| PGRR022 Removal of Planning Reserve Margin Calculation Methodology |
NRG Energy, Inc. |
Approved |
Oct 5 '12 |
Mar 19 '13 |
| PGRR023 Contingency Filing Requirements |
PLWG |
Approved |
Oct 10 '12 |
Mar 19 '13 |
| PGRR024 Clarify Planning Assumptions and Performance Criteria |
PLWG |
Approved |
Oct 31 '12 |
Mar 19 '13 |
| PGRR026 Addition of Year 6 to the SSWG Base Cases |
PLWG |
Approved |
Nov 19 '12 |
Mar 19 '13 |
| PGRR018 Clarify the Prerequisites for Adding a New Generation Resource to the Planning Models (formerly "Clarify the Prerequisites for Adding a New Generation Resource to the Planning Models and Capacity Demand and Reserves Report") |
ERCOT |
Approved |
Feb 21 '12 |
Jan 15 '13 |
| PGRR021 Synchronization with NPRR454, Removal of Unfunded Project List Language, and Modification of Administrative PGRR Definition |
ERCOT |
Approved |
Aug 14 '12 |
Dec 11 '12 |
| PGRR017 New Planning Guide Section 6.1, Steady-State Model Development |
Steady State Working... |
Approved |
Jan 26 '12 |
Jul 17 '12 |
| PGRR019 New Section 1, Overview |
Sergio Garza on... |
Approved |
Apr 2 '12 |
Jun 28 '12 |
| PGRR020 Administrative Changes for the June 1, 2012 Planning Guide |
ERCOT |
Approved |
May 16 '12 |
May 16 '12 |
| PGRR015 New Section 3, Regional Planning |
PLWG |
Approved |
Dec 2 '11 |
May 15 '12 |
| PGRR016 Planning Reserve Margin Review |
PLWG |
Approved |
Dec 5 '11 |
May 15 '12 |
| PGRR012 Dynamics Working Group Guidelines |
Dynamics Working Group (DWG) |
Approved |
Sep 29 '11 |
Apr 17 '12 |
| PGRR013 New Section 6.3, Process for Developing Short Circuit Cases (Portion of SPWG Procedures) |
Kris Koellner on... |
Approved |
Sep 30 '11 |
Apr 17 '12 |
| PGRR014 Synchronization with NPRR374, Modification of SCR Process and Urgency Requirements |
ERCOT |
Approved |
Oct 6 '11 |
Apr 17 '12 |
| PGRR010 New Planning Guide Section 6.7, Data Dictionary |
Rob Lane on behalf... |
Approved |
Jul 26 '11 |
Apr 16 '12 |
| PGRR008 New Planning Guide Section 5 -- Generation Resource Interconnection or Change Request (formerly "New Planning Guide Section 4 -- Generation Resource Interconnection") |
ERCOT |
Approved |
Apr 14 '11 |
Feb 21 '12 |
| PGRR009 New Planning Guide Section 6.8, Resource Registration Procedures |
Rob Lane on behalf... |
Approved |
Jun 29 '11 |
Dec 12 '11 |
| PGRR011 Planning Criteria Clarifications and Enhancements To Narrow The Gap Between Operations and Planning |
Luminant |
Rejected |
Aug 5 '11 |
Nov 10 '11 |
| PGRR005 New Planning Guide Section 4, Transmission Planning Criteria (formerly "New Planning Guide Section 5, Planning Criteria") |
PLWG |
Approved |
Jan 11 '11 |
Aug 16 '11 |
| PGRR006 New Planning Guide Section 6.5, Annual Load Data Request |
PLWG |
Approved |
Jan 18 '11 |
Jul 19 '11 |
| PGRR007 New Planning Guide Section 6, Data/Modeling and 6.4, TPIT Report and Data Requirements |
PLWG |
Approved |
Jan 27 '11 |
Jun 21 '11 |
| PGRR003 New Planning Guide Section 9A, SSWG Procedure Manual |
Planning Working Group (PLWG) |
Withdrawn |
Nov 23 '10 |
May 26 '11 |
| PGRR004 Synchronization with NPRR291, Reduce the Comment Period for NPRRs and SCRs |
ERCOT |
Approved |
Dec 27 '10 |
May 17 '11 |
| PGRR002 New Planning Guide Section 2, Definitions and Acronyms, and Section 8, Planning Reserve Margin (PRM) and Associated Change Process for the PRM (formerly "New Planning Guide Section 2, Definitions and Acronyms, and Section 8, Planning Reserve Margin") |
PLWG |
Approved |
Nov 12 '10 |
Apr 19 '11 |
| PGRR001 ! Planning Guide -- Section 2, Process for Planning Guide Revision |
Planning Working Group (PLWG) |
Approved |
Jun 2 '10 |
Jul 20 '10 |