ERCOT·WATCH Search ercot.com  ⌕
PGRR #136 · Revision Request

PGRR136  Large Load Interconnection Study Scope Documentation

Withdrawn sponsor Schaper Energy Consulting posted 2025-11-25 ercot.com
ReasonStrategic Plan Objective 2
Created2026-01-08
Sections Affected
9.3.2
Summary
This Planning Guide Revision Request (PGRR) implements targeted revisions to Section 9.3.2 to strengthen Large Load Interconnection Study (LLIS) scoping requirements and improve transparency across ERCOT, Transmission Service Providers (TSPs), and Interconnecting Large Load Entities (ILLEs) by enhancing documentation.
Action Log 1 milestones
Ballots
DateBodyResultYesNoAbstain
Jan 8 '26 ROS Motion Carries 7.5 0 0 xls
Documents 4
NameTypePostedClassification
136PGRR-01 Large Load Interconnection Study Scope Documentation 112525 docx Nov 25 '25 Revision Request
136PGRR-02 ROS Ballot 010826 xls Jan 12 '26 Revision Request Ballot
136PGRR-03 ROS Report 010826 docx Jan 12 '26 Committee Report
136PGRR-04 Request for Withdrawal 052226 doc May 22 '26 Revision Request Comments
Meetings That Took It Up 6
DateMeetingCommitteeStatus
Jun 4 '26 ROS Meeting ROS Concluded
May 7 '26 ROS Meeting ROS Concluded
Apr 2 '26 ROS Meeting ROS Concluded
Mar 5 '26 ROS Meeting ROS Concluded
Feb 5 '26 ROS Meeting ROS Concluded
Jan 8 '26 ROS Meeting ROS Concluded