PGRR082  Revise Section 5 and Establish Small Generation Interconnection Process

Approved sponsor ERCOT posted 2020-06-30 ercot.com
ReasonAddresses current operational issues; Market efficiencies or enhancements. This PGRR gives ERCOT visibility of proposed generators and generator modifications that are less than 10 MW in size. The existing interconnection process described in Planning Guide Section 5 does not apply to these smaller projects. With increasing numbers of small generators being proposed, the need for ERCOT to have some visibility of the number and location of these projects becomes more important. This PGRR also specifies interconnection requirements for generators interconnected at distribution voltage, providing needed clarity in the interconnection process. Other organizational and editorial revisions give greater clarity to developers interconnecting generation projects in the ERCOT System.
Created2020-08-06
Approved2020-12-08
Sections Affected
2.255.15.1.15.1.2 (delete)5.2 (new)5.25.2.15.2.2 (delete)5.2.2 (new)5.2.3 (new)5.2.4 (new)5.2.5 (new)5.2.6 (new)5.2.7 (new)5.2.8 (new)5.2.8.1 (new)5.2.8.2 (new)5.2.8.3 (new)5.2.8.4 (new)5.3 (new)5.3 (delete)5.3.1 (delete)5.3.2 (delete)5.3.2.1 (new)5.3.2.4 (new)5.3.3 (new)5.3.4 (new)5.45.4 (new)5.4.15.4.1 (new)5.4.25.4.2 (new)5.4.2.1 (new)5.4.2.15.4.2.25.4.35.4.3 (new)5.4.45.4.4 (new)5.4.55.4.65.4.7 (delete)5.4.85.4.9 (delete)5.4.10 (delete)5.5 (delete)5.5 (new)5.5.1 (delete)5.5.2 (delete)5.5.3 (delete)5.5.4 (delete)5.6 (delete)5.7(delete)5.7.1 (delete)5.7.2 (delete)5.7.3 (delete)5.7.4 (delete)5.7.5 (delete)5.7.6 (delete)5.7.7 (delete)5.8 (delete)5.8.1 (delete)5.8.2 (delete)5.9 (delete)and 6.9
Summary
This Planning Guide Revision Request (PGRR) creates a new interconnection process for generators and generator modifications that are less than 10 MW in size. This process will enable ERCOT to track these generators through the interconnection process and to perform any appropriate studies, if necessary, before these projects would be included in the ERCOT Network Operations Model. As is the case under the current interconnection process, generators 10 MW or larger will be subject to a more rigorous interconnection process, including a screening study, Full Interconnection Study (FIS), Quarterly Stability Analysis, and other requirements. This PGRR also extends the generator interconnection process to apply to distribution-connected Generation Resources and Settlement Only Generators (SOG), and clarifies the roles of ERCOT and Transmission and/or Distribution Service Providers (TDSPs) in interconnecting these generators. This PGRR also reorganizes Section 5, eliminates duplicative language, and provides further clarifications of existing requirements. This PGRR reflects input from stakeholders gathered through a series of workshops.
Action Log 5 milestones
Amendments
DateBodyMotionResult
Oct 8 '20ROS to recommend approval of PGRR082 as amended by the 10/2/20 ERCOT commentsPassed
Nov 18 '20TAC to recommend approval of PGRR082 as recommended by ROS in the 11/5/20 ROS Report as amended by the 11/17/20 ERCOT commentsPassed
Ballots
DateBodyResultYesNoAbstain
Nov 18 '20 TAC Motion Passes 27 0 2 xls
Nov 11 '20 PRS Motion Carries 7 0 0 xls
Nov 5 '20 ROS Motion Carries 7.5 0 0 xls
Oct 8 '20 ROS Motion Carries 7.5 0 0 xls
Aug 6 '20 ROS Motion Carries 7.5 0 0 xls
Documents 15
NameTypePostedClassification
082PGRR-01 Revise Section 5 and Establish Small Generation Interconnection Process 063020 docx Jun 30 '20 Revision Request
082PGRR-02 Impact Analysis 063020 docx Jun 30 '20 Staff Report
082PGRR-03 ROS Ballot 080620 xls Aug 10 '20 Revision Request Ballot
082PGRR-04 ROS Report 080620 docx Aug 10 '20 Committee Report
082PGRR-05 ERCOT Comments 090220 docx Sep 2 '20 Revision Request Comments
082PGRR-06 ERCOT Comments 100220 docx Oct 2 '20 Revision Request Comments
082PGRR-07 ROS Ballot 100820 xls Oct 13 '20 Revision Request Ballot
082PGRR-08 ROS Report 100820 docx Oct 13 '20 Committee Report
082PGRR-09 ROS Ballot 110520 xls Nov 10 '20 Revision Request Ballot
082PGRR-10 ROS Report 110520 docx Nov 10 '20 Committee Report
082PGRR-11 PRS Comments 111120 doc Nov 11 '20 Revision Request Comments
082PGRR-12 ERCOT Comments 111720 docx Nov 17 '20 Revision Request Comments
082PGRR-13 TAC Ballot 111820 xls Nov 23 '20 Revision Request Ballot
082PGRR-14 TAC Report 111820 docx Nov 23 '20 Committee Report
082PGRR-15 Board Report 120820 docx Dec 11 '20 Committee Report
Meetings That Took It Up 8
DateMeetingCommitteeStatus
Dec 8 '20 Urgent Board of Directors Meeting – Teleconference Available by Webcast BOARD Concluded
Nov 18 '20 TAC Meeting by Webex Only TAC Concluded
Nov 11 '20 PRS Meeting by Webex Only PRS Concluded
Nov 5 '20 ROS Meeting by Webex Only ROS Concluded
Oct 8 '20 ROS Meeting by Webex Only ROS Concluded
Sep 3 '20 ROS Meeting ROS Concluded
Aug 19 '20 PLWG Meeting by Webex Only PLWG Concluded
Aug 6 '20 ROS Meeting ROS Concluded