PGRR #82 · Revision Request
PGRR082 Revise Section 5 and Establish Small Generation Interconnection Process
ReasonAddresses current operational issues; Market efficiencies or enhancements. This PGRR gives ERCOT visibility of proposed generators and generator modifications that are less than 10 MW in size. The existing interconnection process described in Planning Guide Section 5 does not apply to these smaller projects. With increasing numbers of small generators being proposed, the need for ERCOT to have some visibility of the number and location of these projects becomes more important. This PGRR also specifies interconnection requirements for generators interconnected at distribution voltage, providing needed clarity in the interconnection process. Other organizational and editorial revisions give greater clarity to developers interconnecting generation projects in the ERCOT System.
Created2020-08-06
Approved2020-12-08
Sections Affected
2.255.15.1.15.1.2 (delete)5.2 (new)5.25.2.15.2.2 (delete)5.2.2 (new)5.2.3 (new)5.2.4 (new)5.2.5 (new)5.2.6 (new)5.2.7 (new)5.2.8 (new)5.2.8.1 (new)5.2.8.2 (new)5.2.8.3 (new)5.2.8.4 (new)5.3 (new)5.3 (delete)5.3.1 (delete)5.3.2 (delete)5.3.2.1 (new)5.3.2.4 (new)5.3.3 (new)5.3.4 (new)5.45.4 (new)5.4.15.4.1 (new)5.4.25.4.2 (new)5.4.2.1 (new)5.4.2.15.4.2.25.4.35.4.3 (new)5.4.45.4.4 (new)5.4.55.4.65.4.7 (delete)5.4.85.4.9 (delete)5.4.10 (delete)5.5 (delete)5.5 (new)5.5.1 (delete)5.5.2 (delete)5.5.3 (delete)5.5.4 (delete)5.6 (delete)5.7(delete)5.7.1 (delete)5.7.2 (delete)5.7.3 (delete)5.7.4 (delete)5.7.5 (delete)5.7.6 (delete)5.7.7 (delete)5.8 (delete)5.8.1 (delete)5.8.2 (delete)5.9 (delete)and 6.9
Summary
This Planning Guide Revision Request (PGRR) creates a new interconnection process for generators and generator modifications that are less than 10 MW in size. This process will enable ERCOT to track these generators through the interconnection process and to perform any appropriate studies, if necessary, before these projects would be included in the ERCOT Network Operations Model. As is the case under the current interconnection process, generators 10 MW or larger will be subject to a more rigorous interconnection process, including a screening study, Full Interconnection Study (FIS), Quarterly Stability Analysis, and other requirements. This PGRR also extends the generator interconnection process to apply to distribution-connected Generation Resources and Settlement Only Generators (SOG), and clarifies the roles of ERCOT and Transmission and/or Distribution Service Providers (TDSPs) in interconnecting these generators. This PGRR also reorganizes Section 5, eliminates duplicative language, and provides further clarifications of existing requirements. This PGRR reflects input from stakeholders gathered through a series of workshops.
Action Log 5 milestones
-
Aug 6
ROSDeferred/Tabled→ Language Consideration
-
Oct 8
ROSRecommended for Approval→ Impact Analysis Consideration
-
Nov 5
ROSRecommended for Approval→ Revision Request Consideration
-
Nov 18
TACRecommended for Approval→ Revision Request Consideration
-
Dec 8
BOARDApproved
Amendments
| Date | Body | Motion | Result |
|---|---|---|---|
| Oct 8 '20 | ROS | to recommend approval of PGRR082 as amended by the 10/2/20 ERCOT comments | Passed |
| Nov 18 '20 | TAC | to recommend approval of PGRR082 as recommended by ROS in the 11/5/20 ROS Report as amended by the 11/17/20 ERCOT comments | Passed |
Ballots
| Date | Body | Result | Yes | No | Abstain | |
|---|---|---|---|---|---|---|
| Nov 18 '20 | TAC | Motion Passes | 27 | 0 | 2 | xls |
| Nov 11 '20 | PRS | Motion Carries | 7 | 0 | 0 | xls |
| Nov 5 '20 | ROS | Motion Carries | 7.5 | 0 | 0 | xls |
| Oct 8 '20 | ROS | Motion Carries | 7.5 | 0 | 0 | xls |
| Aug 6 '20 | ROS | Motion Carries | 7.5 | 0 | 0 | xls |
Documents 15
| Name | Type | Posted | Classification |
|---|---|---|---|
| 082PGRR-01 Revise Section 5 and Establish Small Generation Interconnection Process 063020 | docx | Jun 30 '20 | Revision Request |
| 082PGRR-02 Impact Analysis 063020 | docx | Jun 30 '20 | Staff Report |
| 082PGRR-03 ROS Ballot 080620 | xls | Aug 10 '20 | Revision Request Ballot |
| 082PGRR-04 ROS Report 080620 | docx | Aug 10 '20 | Committee Report |
| 082PGRR-05 ERCOT Comments 090220 | docx | Sep 2 '20 | Revision Request Comments |
| 082PGRR-06 ERCOT Comments 100220 | docx | Oct 2 '20 | Revision Request Comments |
| 082PGRR-07 ROS Ballot 100820 | xls | Oct 13 '20 | Revision Request Ballot |
| 082PGRR-08 ROS Report 100820 | docx | Oct 13 '20 | Committee Report |
| 082PGRR-09 ROS Ballot 110520 | xls | Nov 10 '20 | Revision Request Ballot |
| 082PGRR-10 ROS Report 110520 | docx | Nov 10 '20 | Committee Report |
| 082PGRR-11 PRS Comments 111120 | doc | Nov 11 '20 | Revision Request Comments |
| 082PGRR-12 ERCOT Comments 111720 | docx | Nov 17 '20 | Revision Request Comments |
| 082PGRR-13 TAC Ballot 111820 | xls | Nov 23 '20 | Revision Request Ballot |
| 082PGRR-14 TAC Report 111820 | docx | Nov 23 '20 | Committee Report |
| 082PGRR-15 Board Report 120820 | docx | Dec 11 '20 | Committee Report |
Meetings That Took It Up 8
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Dec 8 '20 | Urgent Board of Directors Meeting – Teleconference Available by Webcast | BOARD | Concluded |
| Nov 18 '20 | TAC Meeting by Webex Only | TAC | Concluded |
| Nov 11 '20 | PRS Meeting by Webex Only | PRS | Concluded |
| Nov 5 '20 | ROS Meeting by Webex Only | ROS | Concluded |
| Oct 8 '20 | ROS Meeting by Webex Only | ROS | Concluded |
| Sep 3 '20 | ROS Meeting | ROS | Concluded |
| Aug 19 '20 | PLWG Meeting by Webex Only | PLWG | Concluded |
| Aug 6 '20 | ROS Meeting | ROS | Concluded |