PGRR #31 · Revision Request

PGRR031  Implement 95% Facility Rating Limit in the Planning Criteria

Rejected sponsor PLWG posted 2013-06-12 ercot.com
  1. ROS Nov 14 '13
  2. TAC Dec 3 '13
  3. BOARD ✕ rejected Aug 12 '14
  4. PUCT
ReasonThe Operations and Planning Synchronization Task Force (OPSTF) identified several factors that could lead to overloads in operations that were not observed in planning studies.
Created2013-08-28
Rejected2014-08-12
Sections Affected
4.1.1.2
Summary
This Planning Guide Revision Request (PGRR) changes the planning criteria such that system improvements are planned when studies show Facilities will be loaded up to 95% of their applicable rating.
Timeline