PGRR111  Related to NPRR1191, Registration, Interconnection, and Operation of Customers with Large Loads; Information Required of Customers with Loads 25 MW or Greater

Withdrawn sponsor ERCOT posted 2023-08-01 ercot.com
ReasonStrategic Plan Objective 1
Created2023-09-07
Sections Affected
2.14.1.1.25.2.10 (new)5.3.56.16.6 (new)6.6.1 (new)6.6.2 (new)6.6.3 (new)6.6.4 (new)7.19 (new)9.1 (new)9.2 (new)9.2.1 (new)9.2.2 (new)9.2.3 (new)9.2.4 (new)9.3 (new)9.3.1 (new)9.3.2 (new)9.3.3 (new)9.3.4 (new)9.3.4.1 (new)9.3.4.2 (new)9.3.4.3 (new)9.4 (new)9.5 (new)9.5.1 (new)9.5.2 (new)9.5.3 (new)9.6 (new)
Summary
This Planning Guide Revision Request (PGRR) creates a new process for studying the reliability impacts of all Large Loads (those 75MW or more) that will be interconnected within 24 months. As with the Full Interconnection Study (FIS) required for proposed Generation Resources, this PGRR requires a Large Load Interconnection Study (LLIS) for each new Large Load meeting applicability requirements that is proposed to interconnect to the ERCOT System. Like the FIS, the LLIS will consist of a similar suite of studies conducted by one or more affected Transmission Service Providers (TSP). This PGRR describes these studies in detail and establishes timelines for the review of these studies and the completion of other steps in the interconnection process. This PGRR requires a Customer proposing to interconnect such a Load—referred to as a “Large Load Interconnecting Entity”—to initiate such a request through ERCOT’s Resource Integration and Ongoing Operations (RIOO) system, which will leverage the efficiency of this existing tool to enable ERCOT and affected TSPs to submit, review, and confirm completion of the studies that are needed. This PGRR also requires some Large Loads to be evaluated as part of the existing quarterly stability assessment. This PGRR also adds additional Reliability Performance Criteria for the inclusion of Large Loads in planning studies.
Action Log 1 milestones
Ballots
DateBodyResultYesNoAbstain
Sep 7 '23 ROS Motion Carries 7.5 0 0 xls
Documents 8
NameTypePostedClassification
111PGRR-01 Related to NPRR1191, Registration, Interconnection, and Operation of Customers with Large Loads; Information Required of Customers with Loads 25 MW or Greater 080123 docx Aug 1 '23 Revision Request
111PGRR-02 Impact Analysis 080123 docx Aug 1 '23 Staff Report
111PGRR-03 ROS Ballot 090723 xls Sep 11 '23 Revision Request Ballot
111PGRR-04 ROS Report 090723 docx Sep 11 '23 Committee Report
111PGRR-05 AEP Comments 101623 docx Oct 16 '23 Revision Request Comments
111PGRR-06 Oncor Comments 101623 docx Oct 16 '23 Revision Request Comments
111PGRR-07 CenterPoint Comments 101623 docx Oct 16 '23 Revision Request Comments
111PGRR-08 Request for Withdrawal 052824 docx May 28 '24 Revision Request
Meetings That Took It Up 13
DateMeetingCommitteeStatus
Jun 6 '24 ROS Meeting ROS Concluded
May 2 '24 ROS Meeting - Webex Only ROS Concluded
Apr 4 '24 ROS Meeting ROS Concluded
Apr 1 '24 LFLTF Meeting LFLTF Concluded
Mar 7 '24 ROS Meeting - Webex Only ROS Concluded
Feb 1 '24 ROS Meeting - Webex Only ROS Concluded
Jan 8 '24 ROS Meeting ROS Concluded
Dec 11 '23 LFLTF Meeting LFLTF Concluded
Dec 7 '23 ROS Meeting - Webex Only ROS Concluded
Nov 2 '23 ROS Meeting ROS Concluded
Oct 23 '23 LFLTF Meeting LFLTF Concluded
Oct 5 '23 ROS Meeting - Webex Only ROS Concluded
Sep 7 '23 ROS Meeting ROS Concluded