PGRR #111 · Revision Request
PGRR111 Related to NPRR1191, Registration, Interconnection, and Operation of Customers with Large Loads; Information Required of Customers with Loads 25 MW or Greater
ReasonStrategic Plan Objective 1
Created2023-09-07
Sections Affected
2.14.1.1.25.2.10 (new)5.3.56.16.6 (new)6.6.1 (new)6.6.2 (new)6.6.3 (new)6.6.4 (new)7.19 (new)9.1 (new)9.2 (new)9.2.1 (new)9.2.2 (new)9.2.3 (new)9.2.4 (new)9.3 (new)9.3.1 (new)9.3.2 (new)9.3.3 (new)9.3.4 (new)9.3.4.1 (new)9.3.4.2 (new)9.3.4.3 (new)9.4 (new)9.5 (new)9.5.1 (new)9.5.2 (new)9.5.3 (new)9.6 (new)
Summary
This Planning Guide Revision Request (PGRR) creates a new process for studying the reliability impacts of all Large Loads (those 75MW or more) that will be interconnected within 24 months. As with the Full Interconnection Study (FIS) required for proposed Generation Resources, this PGRR requires a Large Load Interconnection Study (LLIS) for each new Large Load meeting applicability requirements that is proposed to interconnect to the ERCOT System. Like the FIS, the LLIS will consist of a similar suite of studies conducted by one or more affected Transmission Service Providers (TSP). This PGRR describes these studies in detail and establishes timelines for the review of these studies and the completion of other steps in the interconnection process. This PGRR requires a Customer proposing to interconnect such a Load—referred to as a “Large Load Interconnecting Entity”—to initiate such a request through ERCOT’s Resource Integration and Ongoing Operations (RIOO) system, which will leverage the efficiency of this existing tool to enable ERCOT and affected TSPs to submit, review, and confirm completion of the studies that are needed. This PGRR also requires some Large Loads to be evaluated as part of the existing quarterly stability assessment. This PGRR also adds additional Reliability Performance Criteria for the inclusion of Large Loads in planning studies.
Action Log 1 milestones
-
Sep 7
ROSDeferred/Tabled→ ROS for consideration
Ballots
| Date | Body | Result | Yes | No | Abstain | |
|---|---|---|---|---|---|---|
| Sep 7 '23 | ROS | Motion Carries | 7.5 | 0 | 0 | xls |
Documents 8
| Name | Type | Posted | Classification |
|---|---|---|---|
| 111PGRR-01 Related to NPRR1191, Registration, Interconnection, and Operation of Customers with Large Loads; Information Required of Customers with Loads 25 MW or Greater 080123 | docx | Aug 1 '23 | Revision Request |
| 111PGRR-02 Impact Analysis 080123 | docx | Aug 1 '23 | Staff Report |
| 111PGRR-03 ROS Ballot 090723 | xls | Sep 11 '23 | Revision Request Ballot |
| 111PGRR-04 ROS Report 090723 | docx | Sep 11 '23 | Committee Report |
| 111PGRR-05 AEP Comments 101623 | docx | Oct 16 '23 | Revision Request Comments |
| 111PGRR-06 Oncor Comments 101623 | docx | Oct 16 '23 | Revision Request Comments |
| 111PGRR-07 CenterPoint Comments 101623 | docx | Oct 16 '23 | Revision Request Comments |
| 111PGRR-08 Request for Withdrawal 052824 | docx | May 28 '24 | Revision Request |
Meetings That Took It Up 13
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Jun 6 '24 | ROS Meeting | ROS | Concluded |
| May 2 '24 | ROS Meeting - Webex Only | ROS | Concluded |
| Apr 4 '24 | ROS Meeting | ROS | Concluded |
| Apr 1 '24 | LFLTF Meeting | LFLTF | Concluded |
| Mar 7 '24 | ROS Meeting - Webex Only | ROS | Concluded |
| Feb 1 '24 | ROS Meeting - Webex Only | ROS | Concluded |
| Jan 8 '24 | ROS Meeting | ROS | Concluded |
| Dec 11 '23 | LFLTF Meeting | LFLTF | Concluded |
| Dec 7 '23 | ROS Meeting - Webex Only | ROS | Concluded |
| Nov 2 '23 | ROS Meeting | ROS | Concluded |
| Oct 23 '23 | LFLTF Meeting | LFLTF | Concluded |
| Oct 5 '23 | ROS Meeting - Webex Only | ROS | Concluded |
| Sep 7 '23 | ROS Meeting | ROS | Concluded |