PGRR #27 · Revision Request

PGRR027  Analysis of Subsynchronous Resonance Studies in Transmission Studies

Approved sponsor ERCOT posted 2013-01-15 ercot.com
ReasonWith the addition of multiple series compensated transmission lines to the ERCOT Transmission Grid, the ERCOT System has become vulnerable to much higher risk of SSR between series compensated lines and other Transmission Elements. Type 3 wind turbines (duel feed induction generators) are more vulnerable than most other Transmission Elements to this condition. The combination of series compensated lines and Type 3 wind turbines in the Competitive Renewable Energy Zone (CREZ) transmission zones makes procedures to protect against this reliability problem critical. This PGRR will provide for these procedures.
Created2013-02-27
Approved2013-07-16
Sections Affected
2.25.1.25.4.15.4.25.4.2.15.4.5.15.7.5
Summary
This Planning Guide Revision Request (PGRR) describes how ERCOT will act to protect the ERCOT Transmission Grid from Subsynchronous Resonance (SSR) oscillations since installation of multiple series compensated transmission lines has increased ERCOT’s vulnerability to such oscillations.
Action Log 5 milestones
Amendments
DateBodyMotionResult
Feb 27 '13PLWG To recommend approval of PGRR027 as amended by the 2/22/13 CenterPoint Energy comments and as revised by PLWG
Mar 27 '13PLWG Consensus to endorse and forward the 2/27/13 PLWG Report as amended by the 3/26/13 Oncor comments and as revised by PLWG and the Impact Analysis to ROS
Apr 11 '13ROS To recommend approval of PGRR027 as recommended by PLWG in the 3/27/13 PLWG Report and as revised by ROSPassed
Jul 16 '13BOARD To approve PGRR027 as amended by the 7/2/13 TAC commentsPassed
Documents 12
NameTypePostedClassification
027PGRR-01 Analysis of Subsynchronous Resonance Studies in Trans doc Jan 15 '13 Revision Request
027PGRR-02 Impact Analysis 011513 doc Jan 15 '13 Staff Report
027PGRR-03 LCRA TSC Comments 012413 doc Jan 24 '13 Revision Request Comments
027PGRR-04 CenterPoint Energy Comments 022213 doc Feb 22 '13 Revision Request Comments
027PGRR-05 PLWG Report 022713 doc Mar 1 '13 Committee Report
027PGRR-06 Oncor Comments 032613 doc Mar 28 '13 Revision Request Comments
027PGRR-07 PLWG Report 032713 doc Apr 1 '13 Committee Report
027PGRR-08 ROS Report 041113 doc Apr 16 '13 Committee Report
027PGRR-09 TAC Report 050213 doc May 2 '13 Committee Report
027PGRR-10 OWG Comments 062513 doc Jun 25 '13 Revision Request Comments
027PGRR-11 TAC Comments 070213 doc Jul 2 '13 Revision Request Comments
027PGRR-12 Board Report 071613 doc Jul 17 '13 Committee Report
Meetings That Took It Up 7
DateMeetingCommitteeStatus
Aug 28 '13 Planning Working Group (PLWG) Meeting PLWG Concluded
Jul 16 '13 Board of Directors Meeting BOARD Concluded
Jul 2 '13 Technical Advisory Comittee (TAC) Meeting TAC Concluded
Jun 26 '13 Planning Working Group (PLWG) Meeting PLWG Concluded
May 2 '13 Technical Advisory Committee (TAC) Meeting TAC Concluded
Apr 11 '13 Reliability and Operations Subcommittee (ROS) Meeting ROS Concluded
Feb 27 '13 Planning Working Group (PLWG) Meeting PLWG Concluded