PGRR #116 · Revision Request
PGRR116 Related to NPRR1240, Access to Transmission Planning Information
ReasonGeneral system and/or process improvement(s)
Created2024-08-01
Approved2025-01-16
Sections Affected
3.1.1.14.1and 7.1
Summary
This Planning Guide Revision Request (PGRR) updates Planning Guide language to reflect the current practice of posting versions of the ERCOT Long-Term System Assessment (LTSA) and correspondingly updates the chart of data sets and designated classifications in paragraph (2) of Section 7.1, Planning Data and Information. The PGRR moves from the Market Information System (MIS) Secure Area to the public ERCOT website Transmission Service Provider (TSP) Annual Planning Criteria and correspondingly updates the chart of data sets and designated classifications in paragraph (2) of Section 7.1. The Planning Guide does not designate the criteria to be Protected Information such as to be posted in the section of the MIS Secure Area that is Certified for TSPs Only, and the Guide instead requires the criteria to be posted in the MIS Secure Area that is available to all Market Participants who register and request a Digital Certificate to access the MIS Secure Area. ERCOT Staff analyzed past TSP criteria submissions, along with existing Protocols for posting requirements, and identified no ongoing basis for holding in the MIS Secure Area submissions that contain only criteria for a market audience and not ECEII. Section 4.1, Introduction, requires TSPs to submit criteria if they use their own criteria in addition to the Planning Guide, and ERCOT has received five submissions since the year 2020, including two submissions in 2024. Prior to implementation of this PGRR and posting on the ERCOT website of criteria submissions to ERCOT, TSPs are encouraged to confirm their criteria submissions in the MIS Secure Area, if any, don’t contain ECEII and label the cover page and pages or portions of any ECEII submitted to ERCOT pursuant to paragraph (1) of Protocol Section 1.3.2.2, Submission of ERCOT Critical Energy Infrastructure Information to ERCOT. This PGRR also updates Planning Guide language to reflect the current practice of posting on the ERCOT website the Demand and Energy Monthly report, adding a requirement to include 15-minute interval data that is included in a version of the report currently posted on only the MIS Secure Area. ERCOT Staff analyzed the 15-minute interval data, along with existing Protocols for posting requirements, and identified no ongoing basis for holding in the MIS Secure Area Demand and Energy Monthly Reports that contain 15-minute interval data and not ECEII. This PGRR correspondingly updates the chart of data sets and designated classifications in paragraph (2) of Section 7.1. Finally, this PGRR clarifies the chart of data sets and designated classifications in paragraph (2) of Section 7.1 of the Guide does not constitute posting requirements. The chart is updated to reflect Generation Interconnection data sets now processed in Resource Integration and On-going Operations – Resource Services (RIOO-RS) rather than posted on the MIS Secure Area and removes references to Generation Interconnection or Change Request (GINR) forms no longer in use.
Action Log 7 milestones
-
Aug 1
ROSDeferred/Tabled→ Language Consideration
-
Sep 9
ROSRecommended for Approval→ Impact Analysis Consideration
-
Oct 3
ROSRecommended for Approval→ Revision Request Consideration
-
Oct 30
TACDeferred/Tabled→ Revision Request Consideration
-
Nov 20
TACRecommended for Approval→ Revision Request Consideration
-
Dec 3
BOARDRecommended for Approval→ Revision Request Consideration
-
Jan 16
PUCTApproved
Ballots
| Date | Body | Result | Yes | No | Abstain | |
|---|---|---|---|---|---|---|
| Nov 20 '24 | TAC | Motion Passes | 29 | 0 | 0 | xls |
| Oct 30 '24 | TAC | Motion Passes | 30 | 0 | 0 | xls |
| Oct 3 '24 | ROS | Motion Carries | 7.5 | 0 | 0 | xls |
| Sep 9 '24 | ROS | Motion Carries | 7.5 | 0 | 0 | xls |
| Aug 1 '24 | ROS | Motion Carries | 7.5 | 0 | 0 | xls |
Documents 14
| Name | Type | Posted | Classification |
|---|---|---|---|
| 116PGRR-01 Related to NPRR1240 Access to Transmission Planning Information 070224 | docx | Jul 2 '24 | Revision Request |
| 116PGRR-02 Impact Analysis 070224 | docx | Jul 2 '24 | Staff Report |
| 116PGRR-03 ROS Ballot 080124 | xls | Aug 6 '24 | Revision Request Ballot |
| 116PGRR-04 ROS Report 080124 | docx | Aug 6 '24 | Committee Report |
| 116PGRR-05 ROS Ballot 090924 | xls | Sep 12 '24 | Revision Request Ballot |
| 116PGRR-06 ROS Report 090924 | docx | Sep 12 '24 | Committee Report |
| 116PGRR-07 ROS Ballot 100324 | xls | Oct 8 '24 | Revision Request Ballot |
| 116PGRR-08 ROS Report 100324 | docx | Oct 8 '24 | Committee Report |
| 116PGRR-09 TAC Ballot 103024 | xls | Nov 4 '24 | Revision Request Ballot |
| 116PGRR-10 TAC Report 103024 | docx | Nov 4 '24 | Committee Report |
| 116PGRR-11 TAC Ballot 112024 | xls | Nov 21 '24 | Revision Request Ballot |
| 116PGRR-12 TAC Report 112024 | docx | Nov 21 '24 | Committee Report |
| 116PGRR-13 Board Report 120324 | docx | Dec 5 '24 | Committee Report |
| 116PGRR-14 PUCT Report 011625 | docx | Jan 22 '25 | Committee Report |
Meetings That Took It Up 6
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Dec 3 '24 | Board of Directors Meeting | BOARD | Concluded |
| Nov 20 '24 | TAC Meeting | TAC | Concluded |
| Oct 30 '24 | TAC Meeting - Webex Only | TAC | Concluded |
| Oct 3 '24 | ROS Meeting - Webex Only | ROS | Concluded |
| Sep 9 '24 | ROS Meeting - Webex Only | ROS | Concluded |
| Aug 1 '24 | ROS Meeting - Webex Only | ROS | Concluded |