PGRR035  DC Tie Interconnection Process

Withdrawn sponsor John Moore on behalf of Pattern Energy posted 2013-11-04 ercot.com
ReasonTo formalize the Direct Current Tie (DC Tie) interconnection process in the Protocols and Guides. It is recognized that the current DC Tie definition in the Protocols is not technically correct and separate actions will be pursued to more accurately use the terms "asynchronous tie" and "DC Tie" in both the Protocols and Guides.
Created2013-11-22
Sections Affected
2.26.11 (new)7 (new)7.1 (new)7.1.1 (new)7.1.2 (new)7.2 (new)7.2.1 (new)7.2.2 (new)7.3 (new)7.3.1 (new)7.3.2 (new)7.4 (new)7.4.1(new)7.4.2 (new)7.4.3 (new)7.4.3.1 (new)7.4.3.2 (new)7.4.3.3 (new)7.4.3.4 (new)7.4.3.5 (new)7.5 (new)7.6 (new)7.7 (new)7.8 (new)7.9 (new)7.10 (new)7.11 (new)7.12 (new)7.13 (new)7.14 new)7.14.1 (new)7.14.2 (new)7.15 (new)
Summary
This Planning Guide Revision Request (PGRR) incorporates the ERCOT white paper describing the Asynchronous Tie Interconnection Process into the Planning Guides; renames the "Tie" to be "DC Tie"; and reflects the current definition of DC Tie in the Protocols. This PGRR also replaces PGRR034, Asynchronous Tie Interconnection Process, which was withdrawn on 10/28/13.
Action Log 1 milestones
Documents 4
NameTypePostedClassification
035PGRR-01 DC Tie Interconnection Process 110413 doc Nov 4 '13 Revision Request
035PGRR-02 Tres Amigas Comments 111913 doc Nov 19 '13 Revision Request Comments
035PGRR-03 PLWG Report 112213 doc Nov 26 '13 Committee Report
035PGRR-04 Request for Withdrawal 102214 doc Oct 22 '14 Revision Request Comments
Meetings That Took It Up 8
DateMeetingCommitteeStatus
Nov 18 '14 PLWG Meeting PLWG Concluded
Aug 20 '14 PLWG Meeting PLWG Concluded
Jul 23 '14 PLWG Meeting PLWG Concluded
Jun 18 '14 PLWG Meeting PLWG Concluded
Apr 23 '14 PLWG Meeting PLWG Concluded
Mar 26 '14 PLWG Meeting PLWG Concluded
Jan 22 '14 PLWG Meeting PLWG Concluded
Nov 22 '13 Planning Working Group (PLWG) Meeting PLWG Concluded