PGRR #115 · Revision Request
PGRR115 Related to NPRR1234, Interconnection Requirements for Large Loads and Modeling Standards for Loads 25 MW or Greater
ReasonStrategic Plan Objective 1
Created2024-07-11
Approved2025-05-15
Sections Affected
2.14.1.1.14.1.1.25.2.10 (new)5.3.56.6 (new)6.6.1 (new)6.6.2 (new)6.6.3 (new)6.109 (new)9.1 (new)9.2 (new)9.2.1 (new)9.2.2 (new)9.2.3 (new)9.2.4 (new)9.2.5 (new)9.3 (new)9.3.1 (new)9.3.2 (new)9.3.3 (new)9.3.4 (new)9.3.4.1 (new)9.3.4.2 (new)9.3.4.3 (new)9.4 (new)9.5 (new)9.5.1 (new)9.5.2 (new)and 9.6 (new)
Summary
This Planning Guide Revision Request (PGRR) creates a new process for studying the reliability impacts of all Large Loads (as defined in the accompanying NPRR1234) seeking to interconnect to the ERCOT System. As with the Full Interconnection Study (FIS) required for proposed Generation Resources, this PGRR requires a Large Load Interconnection Study (LLIS) for each new Large Load meeting applicability requirements that is proposed to interconnect to the ERCOT System. Like the FIS, the LLIS will consist of a similar suite of studies conducted by one or more affected Transmission Service Providers (TSPs). This PGRR describes these studies in detail and establishes timelines for the review of these studies and the completion of other steps in the interconnection process. This PGRR also: requires all Large Loads evaluated via the LLIS to be included in the existing quarterly stability assessment prior to Initial Energization; adds additional reliability performance criteria for the inclusion and evaluation of Large Loads in planning studies; adds requirements that must be met prior to including a Large Load in the ERCOT Network Operations Model; and establishes required interconnection equipment for both Generation Resources and Large Loads.
Action Log 6 milestones
-
Jul 11
ROSDeferred/Tabled→ ROS for consideration
-
Feb 6
ROSRecommended for Approval→ ROS for Impact Analysis consideration
-
Mar 6
ROSRecommended for Approval→ TAC for consideration
-
Mar 26
TACRecommended for Approval→ Board for consideration
-
Apr 8
BOARDRecommended for Approval→ PUCT for consideration
-
May 15
PUCTApproved
Amendments
| Date | Body | Motion | Result |
|---|---|---|---|
| Feb 6 '25 | ROS | To recommend approval of PGRR115 as amended by the 2/5/25 CenterPoint comments | Passed |
| Mar 6 '25 | ROS | To endorse and forward to TAC the 2/6/25 ROS Report as amended by the 2/14/25 ERCOT Steel Mills comments and the 5/28/24 Impact Analysis for PGRR115 | Passed |
| Mar 26 '25 | TAC | To recommend approval of PGRR115 as recommended by ROS in the 3/6/25 ROS Report as revised by TAC | Passed |
Ballots
| Date | Body | Result | Yes | No | Abstain | |
|---|---|---|---|---|---|---|
| Mar 26 '25 | TAC | Motion Fails | 4 | 25 | 1 | xls |
| Mar 26 '25 | TAC | Motion Passes | 27 | 0 | 3 | xls |
| Mar 26 '25 | TAC | Motion Passes | 27 | 0 | 3 | xls |
| Mar 26 '25 | TAC | Motion Passes | 28 | 0 | 2 | xls |
| Mar 6 '25 | ROS | Motion Carries | 7.5 | 0 | 0 | xls |
| Feb 6 '25 | ROS | Motion Carries | 7.5 | 0 | 0 | xls |
| Jul 11 '24 | ROS | Motion Carries | 7.5 | 0 | 0 | xls |
Documents 30
| Name | Type | Posted | Classification |
|---|---|---|---|
| 115PGRR-01 Related to NPRR1234, Interconnection Requirements for Large Loads and Modeling Standards for Loads 25 MW or Greater 052824 | docx | May 28 '24 | Revision Request |
| 115PGRR-02 Impact Analysis 052824 | docx | May 28 '24 | Staff Report |
| 115PGRR-03 ERCOT Steel Mills Comments 070324 | docx | Jul 3 '24 | Revision Request Comments |
| 115PGRR-04 ROS Ballot 071124 | xls | Jul 12 '24 | Revision Request Ballot |
| 115PGRR-05 ROS Report 071124 | docx | Jul 12 '24 | Committee Report |
| 115PGRR-06 ERCOT Comments 081224 | docx | Aug 12 '24 | Revision Request Comments |
| 115PGRR-07 CenterPoint Energy Comments 082924 | docx | Aug 29 '24 | Revision Request Comments |
| 115PGRR-08 Oncor Comments 090924 | docx | Sep 9 '24 | Revision Request Comments |
| 115PGRR-09 ERCOT Steel Mills Comments 091824 | docx | Sep 18 '24 | Revision Request Comments |
| 115PGRR-10 ERCOT Steel Mills Comments 092524 | docx | Sep 25 '24 | Revision Request Comments |
| 115PGRR-11 AEP Comments 100424 | docx | Oct 4 '24 | Revision Request Comments |
| 115PGRR-12 ERCOT Comments 111124 | docx | Nov 11 '24 | Revision Request Comments |
| 115PGRR-13 CenterPoint Comments 121224 | docx | Dec 12 '24 | Revision Request Comments |
| 115PGRR-14 Joint TSPs Comments 121224 | docx | Dec 12 '24 | Revision Request Comments |
| 115PGRR-15 Oncor Comments 121224 | docx | Dec 12 '24 | Revision Request Comments |
| 115PGRR-16 ERCOT Steel Mills Comments 121924 | docx | Dec 19 '24 | Revision Request Comments |
| 115PGRR-17 ERCOT Comments 012425 | docx | Jan 24 '25 | Revision Request Comments |
| 115PGRR-18 ERCOT Steel Mills Comments 012925 | docx | Jan 29 '25 | Revision Request Comments |
| 115PGRR-19 PLWG Comments 013025 | docx | Jan 30 '25 | Revision Request Comments |
| 115PGRR-20 Google Comments 020425 | docx | Feb 4 '25 | Revision Request Comments |
| 115PGRR-21 CenterPoint Comments 020525 | docx | Feb 5 '25 | Revision Request Comments |
| 115PGRR-22 ROS Ballot 020625 | xls | Feb 7 '25 | Revision Request Ballot |
| 115PGRR-23 ROS Report 020625 | docx | Feb 7 '25 | Committee Report |
| 115PGRR-24 ERCOT Steel Mills Comments 021425 | docx | Feb 14 '25 | Revision Request Comments |
| 115PGRR-25 ROS Ballot 030625 | xls | Mar 11 '25 | Revision Request Ballot |
| 115PGRR-26 ROS Report 030625 | docx | Mar 11 '25 | Committee Report |
| 115PGRR-27 TAC Ballot 032625 | xls | Mar 27 '25 | Revision Request Ballot |
| 115PGRR-28 TAC Report 032625 | docx | Mar 27 '25 | Committee Report |
| 115PGRR-29 Board Report 040825 | docx | Apr 8 '25 | Committee Report |
| 115PGRR-30 PUCT Report 051525 | docx | May 15 '25 | Committee Report |
Meetings That Took It Up 31
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Jun 1 '26 | Board of Directors Meeting | BOARD | Concluded |
| Apr 29 '26 | TAC Meeting | TAC | Concluded |
| Apr 2 '26 | ROS Meeting | ROS | Concluded |
| Mar 5 '26 | ROS Meeting | ROS | Concluded |
| Feb 5 '26 | ROS Meeting | ROS | Concluded |
| Jan 8 '26 | ROS Meeting | ROS | Concluded |
| Dec 8 '25 | Board of Directors Meeting | BOARD | Concluded |
| Dec 4 '25 | ROS Meeting - Webex Only | ROS | Concluded |
| Nov 6 '25 | ROS Meeting - Webex Only | ROS | Concluded |
| Jul 15 '25 | NDSWG Meeting - Webex Only | NDSWG | Concluded |
| Apr 7 '25 | Board of Directors Meeting | BOARD | Concluded |
| Mar 26 '25 | TAC Meeting | TAC | Concluded |
| Mar 6 '25 | ROS Meeting | ROS | Concluded |
| Feb 6 '25 | ROS Meeting - Webex Only | ROS | Concluded |
| Jan 29 '25 | PLWG Meeting | PLWG | Concluded |
| Jan 9 '25 | ROS Meeting - Webex Only | ROS | Concluded |
| Dec 18 '24 | PLWG Meeting - Webex Only | PLWG | Concluded |
| Dec 5 '24 | ROS Meeting - Webex Only | ROS | Concluded |
| Nov 12 '24 | PLWG Meeting | PLWG | Concluded |
| Nov 7 '24 | ROS Meeting | ROS | Concluded |
| Oct 16 '24 | PLWG Meeting | PLWG | Concluded |
| Oct 3 '24 | ROS Meeting - Webex Only | ROS | Concluded |
| Sep 24 '24 | PLWG - Webex Only | PLWG | Concluded |
| Sep 9 '24 | ROS Meeting - Webex Only | ROS | Concluded |
| Aug 13 '24 | PLWG Meeting | PLWG | Concluded |
| Aug 1 '24 | ROS Meeting - Webex Only | ROS | Concluded |
| Jul 16 '24 | PLWG Meeting | PLWG | Concluded |
| Jul 11 '24 | ROS Meeting - Webex Only | ROS | Concluded |
| Jun 12 '24 | RIWG Meeting - Webex Only | RIWG | Concluded |
| Jun 6 '24 | ROS Meeting | ROS | Concluded |
| Jun 3 '24 | LFLTF Meeting | LFLTF | Concluded |