PGRR #115 · Revision Request

PGRR115  Related to NPRR1234, Interconnection Requirements for Large Loads and Modeling Standards for Loads 25 MW or Greater

Approved sponsor ERCOT posted 2024-05-28 ercot.com
ReasonStrategic Plan Objective 1
Created2024-07-11
Approved2025-05-15
Sections Affected
2.14.1.1.14.1.1.25.2.10 (new)5.3.56.6 (new)6.6.1 (new)6.6.2 (new)6.6.3 (new)6.109 (new)9.1 (new)9.2 (new)9.2.1 (new)9.2.2 (new)9.2.3 (new)9.2.4 (new)9.2.5 (new)9.3 (new)9.3.1 (new)9.3.2 (new)9.3.3 (new)9.3.4 (new)9.3.4.1 (new)9.3.4.2 (new)9.3.4.3 (new)9.4 (new)9.5 (new)9.5.1 (new)9.5.2 (new)and 9.6 (new)
Summary
This Planning Guide Revision Request (PGRR) creates a new process for studying the reliability impacts of all Large Loads (as defined in the accompanying NPRR1234) seeking to interconnect to the ERCOT System. As with the Full Interconnection Study (FIS) required for proposed Generation Resources, this PGRR requires a Large Load Interconnection Study (LLIS) for each new Large Load meeting applicability requirements that is proposed to interconnect to the ERCOT System. Like the FIS, the LLIS will consist of a similar suite of studies conducted by one or more affected Transmission Service Providers (TSPs). This PGRR describes these studies in detail and establishes timelines for the review of these studies and the completion of other steps in the interconnection process. This PGRR also: requires all Large Loads evaluated via the LLIS to be included in the existing quarterly stability assessment prior to Initial Energization; adds additional reliability performance criteria for the inclusion and evaluation of Large Loads in planning studies; adds requirements that must be met prior to including a Large Load in the ERCOT Network Operations Model; and establishes required interconnection equipment for both Generation Resources and Large Loads.
Action Log 6 milestones
Amendments
DateBodyMotionResult
Feb 6 '25ROS To recommend approval of PGRR115 as amended by the 2/5/25 CenterPoint commentsPassed
Mar 6 '25ROS To endorse and forward to TAC the 2/6/25 ROS Report as amended by the 2/14/25 ERCOT Steel Mills comments and the 5/28/24 Impact Analysis for PGRR115Passed
Mar 26 '25TAC To recommend approval of PGRR115 as recommended by ROS in the 3/6/25 ROS Report as revised by TACPassed
Ballots
DateBodyResultYesNoAbstain
Mar 26 '25 TAC Motion Fails 4 25 1 xls
Mar 26 '25 TAC Motion Passes 27 0 3 xls
Mar 26 '25 TAC Motion Passes 27 0 3 xls
Mar 26 '25 TAC Motion Passes 28 0 2 xls
Mar 6 '25 ROS Motion Carries 7.5 0 0 xls
Feb 6 '25 ROS Motion Carries 7.5 0 0 xls
Jul 11 '24 ROS Motion Carries 7.5 0 0 xls
Documents 30
NameTypePostedClassification
115PGRR-01 Related to NPRR1234, Interconnection Requirements for Large Loads and Modeling Standards for Loads 25 MW or Greater 052824 docx May 28 '24 Revision Request
115PGRR-02 Impact Analysis 052824 docx May 28 '24 Staff Report
115PGRR-03 ERCOT Steel Mills Comments 070324 docx Jul 3 '24 Revision Request Comments
115PGRR-04 ROS Ballot 071124 xls Jul 12 '24 Revision Request Ballot
115PGRR-05 ROS Report 071124 docx Jul 12 '24 Committee Report
115PGRR-06 ERCOT Comments 081224 docx Aug 12 '24 Revision Request Comments
115PGRR-07 CenterPoint Energy Comments 082924 docx Aug 29 '24 Revision Request Comments
115PGRR-08 Oncor Comments 090924 docx Sep 9 '24 Revision Request Comments
115PGRR-09 ERCOT Steel Mills Comments 091824 docx Sep 18 '24 Revision Request Comments
115PGRR-10 ERCOT Steel Mills Comments 092524 docx Sep 25 '24 Revision Request Comments
115PGRR-11 AEP Comments 100424 docx Oct 4 '24 Revision Request Comments
115PGRR-12 ERCOT Comments 111124 docx Nov 11 '24 Revision Request Comments
115PGRR-13 CenterPoint Comments 121224 docx Dec 12 '24 Revision Request Comments
115PGRR-14 Joint TSPs Comments 121224 docx Dec 12 '24 Revision Request Comments
115PGRR-15 Oncor Comments 121224 docx Dec 12 '24 Revision Request Comments
115PGRR-16 ERCOT Steel Mills Comments 121924 docx Dec 19 '24 Revision Request Comments
115PGRR-17 ERCOT Comments 012425 docx Jan 24 '25 Revision Request Comments
115PGRR-18 ERCOT Steel Mills Comments 012925 docx Jan 29 '25 Revision Request Comments
115PGRR-19 PLWG Comments 013025 docx Jan 30 '25 Revision Request Comments
115PGRR-20 Google Comments 020425 docx Feb 4 '25 Revision Request Comments
115PGRR-21 CenterPoint Comments 020525 docx Feb 5 '25 Revision Request Comments
115PGRR-22 ROS Ballot 020625 xls Feb 7 '25 Revision Request Ballot
115PGRR-23 ROS Report 020625 docx Feb 7 '25 Committee Report
115PGRR-24 ERCOT Steel Mills Comments 021425 docx Feb 14 '25 Revision Request Comments
115PGRR-25 ROS Ballot 030625 xls Mar 11 '25 Revision Request Ballot
115PGRR-26 ROS Report 030625 docx Mar 11 '25 Committee Report
115PGRR-27 TAC Ballot 032625 xls Mar 27 '25 Revision Request Ballot
115PGRR-28 TAC Report 032625 docx Mar 27 '25 Committee Report
115PGRR-29 Board Report 040825 docx Apr 8 '25 Committee Report
115PGRR-30 PUCT Report 051525 docx May 15 '25 Committee Report
Meetings That Took It Up 31
DateMeetingCommitteeStatus
Jun 1 '26 Board of Directors Meeting BOARD Concluded
Apr 29 '26 TAC Meeting TAC Concluded
Apr 2 '26 ROS Meeting ROS Concluded
Mar 5 '26 ROS Meeting ROS Concluded
Feb 5 '26 ROS Meeting ROS Concluded
Jan 8 '26 ROS Meeting ROS Concluded
Dec 8 '25 Board of Directors Meeting BOARD Concluded
Dec 4 '25 ROS Meeting - Webex Only ROS Concluded
Nov 6 '25 ROS Meeting - Webex Only ROS Concluded
Jul 15 '25 NDSWG Meeting - Webex Only NDSWG Concluded
Apr 7 '25 Board of Directors Meeting BOARD Concluded
Mar 26 '25 TAC Meeting TAC Concluded
Mar 6 '25 ROS Meeting ROS Concluded
Feb 6 '25 ROS Meeting - Webex Only ROS Concluded
Jan 29 '25 PLWG Meeting PLWG Concluded
Jan 9 '25 ROS Meeting - Webex Only ROS Concluded
Dec 18 '24 PLWG Meeting - Webex Only PLWG Concluded
Dec 5 '24 ROS Meeting - Webex Only ROS Concluded
Nov 12 '24 PLWG Meeting PLWG Concluded
Nov 7 '24 ROS Meeting ROS Concluded
Oct 16 '24 PLWG Meeting PLWG Concluded
Oct 3 '24 ROS Meeting - Webex Only ROS Concluded
Sep 24 '24 PLWG - Webex Only PLWG Concluded
Sep 9 '24 ROS Meeting - Webex Only ROS Concluded
Aug 13 '24 PLWG Meeting PLWG Concluded
Aug 1 '24 ROS Meeting - Webex Only ROS Concluded
Jul 16 '24 PLWG Meeting PLWG Concluded
Jul 11 '24 ROS Meeting - Webex Only ROS Concluded
Jun 12 '24 RIWG Meeting - Webex Only RIWG Concluded
Jun 6 '24 ROS Meeting ROS Concluded
Jun 3 '24 LFLTF Meeting LFLTF Concluded