PGRR #134 · Revision Request

PGRR134  Interconnection Studies Reform for Dispatchable Loads

Withdrawn sponsor Luminary Strategies posted 2025-11-01 ercot.com
ReasonStrategic Plan Objective 2
Created2025-12-04
Sections Affected
2.14.1.1.14.1.1.7and 6.1
Summary
This PGRR allows Interconnecting Large Load Entities (ILLEs) to submit an NPRR1188-compliant Controllable Load Resources (CLR) election to the reviewing Transmission Service Provider (TSP). TSPs treat the election as a CLR Election Study input, model the site as an NPRR1188-compliant CLR, and may authorize earlier energization when constraints can be mitigated by dispatch down to the CLR Low Power Consumption (LPC), which may equal zero for the CLR. All Load would still be studied for delivery of their full capacity with timelines for firm network service outlined in the Load Commissioning Plan (LCP). Additionally, this PGRR directs that each proposed Large Load that elects to be studied as a CLR will be studied using the LPC and Maximum Power Consumption (MPC) provided as part of project information described in Section 9.2.2, Submission of Large Load Project Information and Initiation of the Large Load Interconnection Study (LLIS). It further directs that for the purposes of the Large Load Interconnection Study Methodology, CLRs will be studied assuming registration and qualification under NPRR1188 or any successor provision. Finally, this PGRR prohibits a CLR from using this program if it would impair a previously submitted Large Load’s requested energization date or energization capacity and that ERCOT may specify Interconnection Reliability Operating Limits (IROLs) or other reliability related transmission limits which cannot be resolved with CLR dispatch.
Action Log 1 milestones
Ballots
DateBodyResultYesNoAbstain
Dec 4 '25 ROS Motion Carries 7.5 0 0 xls
Documents 18
NameTypePostedClassification
134PGRR-01 Interconnection Studies Reform for Dispatachable Loads 110125 docx Nov 1 '25 Revision Request
134PGRR-02 Luminary Strategies Comments 110125 docx Nov 1 '25 Revision Request Comments
134PGRR-03 Agentic Infrastructure Comments 110325 docx Nov 3 '25 Revision Request Comments
134PGRR-04 Schaper Energy Consulting Comments 110325 docx Nov 3 '25 Revision Request Comments
134PGRR-05 Luminary Strategies Comments 110425 docx Nov 4 '25 Revision Request Comments
134PGRR-06 ERCOT Comments 110525 docx Nov 5 '25 Revision Request Comments
134PGRR-07 Cypress Creek Renewables Comments 110525 docx Nov 5 '25 Revision Request Comments
134PGRR-08 impactECI Comments 110525 docx Nov 5 '25 Revision Request Comments
134PGRR-09 Joint Commenters Comments 111425 docx Nov 14 '25 Revision Request Comments
134PGRR-10 Emerald AI Comments 111725 docx Nov 17 '25 Revision Request Comments
134PGRR-11 Luminary Strategies Comments 111725 docx Nov 17 '25 Revision Request Comments
134PGRR-12 GridCARE Comments 112025 docx Nov 20 '25 Revision Request Comments
134PGRR-13 ROS Ballot 120425 xls Dec 5 '25 Revision Request Ballot
134PGRR-14 ROS Report 120425 docx Dec 5 '25 Committee Report
134PGRR-15 Camus Energy Comments 120825 docx Dec 8 '25 Revision Request Comments
134PGRR-16 Oncor Comments 120925 docx Dec 9 '25 Revision Request Comments
134PGRR-17 V-Wire Comments 020626 docx Feb 6 '26 Revision Request Comments
134PGRR-18 Request for Withdrawal 052726 docx May 27 '26 Revision Request
Meetings That Took It Up 8
DateMeetingCommitteeStatus
May 7 '26 ROS Meeting ROS Concluded
Apr 2 '26 ROS Meeting ROS Concluded
Mar 5 '26 ROS Meeting ROS Concluded
Feb 5 '26 ROS Meeting ROS Concluded
Jan 8 '26 ROS Meeting ROS Concluded
Dec 15 '25 CMWG Meeting - Webex Only CMWG Concluded
Dec 4 '25 ROS Meeting - Webex Only ROS Concluded
Nov 6 '25 ROS Meeting - Webex Only ROS Concluded