PGRR #134 · Revision Request
PGRR134 Interconnection Studies Reform for Dispatchable Loads
ReasonStrategic Plan Objective 2
Created2025-12-04
Sections Affected
2.14.1.1.14.1.1.7and 6.1
Summary
This PGRR allows Interconnecting Large Load Entities (ILLEs) to submit an NPRR1188-compliant Controllable Load Resources (CLR) election to the reviewing Transmission Service Provider (TSP). TSPs treat the election as a CLR Election Study input, model the site as an NPRR1188-compliant CLR, and may authorize earlier energization when constraints can be mitigated by dispatch down to the CLR Low Power Consumption (LPC), which may equal zero for the CLR. All Load would still be studied for delivery of their full capacity with timelines for firm network service outlined in the Load Commissioning Plan (LCP). Additionally, this PGRR directs that each proposed Large Load that elects to be studied as a CLR will be studied using the LPC and Maximum Power Consumption (MPC) provided as part of project information described in Section 9.2.2, Submission of Large Load Project Information and Initiation of the Large Load Interconnection Study (LLIS). It further directs that for the purposes of the Large Load Interconnection Study Methodology, CLRs will be studied assuming registration and qualification under NPRR1188 or any successor provision. Finally, this PGRR prohibits a CLR from using this program if it would impair a previously submitted Large Load’s requested energization date or energization capacity and that ERCOT may specify Interconnection Reliability Operating Limits (IROLs) or other reliability related transmission limits which cannot be resolved with CLR dispatch.
Action Log 1 milestones
-
Dec 4
ROSDeferred/Tabled→ ROS for consideration
Ballots
| Date | Body | Result | Yes | No | Abstain | |
|---|---|---|---|---|---|---|
| Dec 4 '25 | ROS | Motion Carries | 7.5 | 0 | 0 | xls |
Documents 18
| Name | Type | Posted | Classification |
|---|---|---|---|
| 134PGRR-01 Interconnection Studies Reform for Dispatachable Loads 110125 | docx | Nov 1 '25 | Revision Request |
| 134PGRR-02 Luminary Strategies Comments 110125 | docx | Nov 1 '25 | Revision Request Comments |
| 134PGRR-03 Agentic Infrastructure Comments 110325 | docx | Nov 3 '25 | Revision Request Comments |
| 134PGRR-04 Schaper Energy Consulting Comments 110325 | docx | Nov 3 '25 | Revision Request Comments |
| 134PGRR-05 Luminary Strategies Comments 110425 | docx | Nov 4 '25 | Revision Request Comments |
| 134PGRR-06 ERCOT Comments 110525 | docx | Nov 5 '25 | Revision Request Comments |
| 134PGRR-07 Cypress Creek Renewables Comments 110525 | docx | Nov 5 '25 | Revision Request Comments |
| 134PGRR-08 impactECI Comments 110525 | docx | Nov 5 '25 | Revision Request Comments |
| 134PGRR-09 Joint Commenters Comments 111425 | docx | Nov 14 '25 | Revision Request Comments |
| 134PGRR-10 Emerald AI Comments 111725 | docx | Nov 17 '25 | Revision Request Comments |
| 134PGRR-11 Luminary Strategies Comments 111725 | docx | Nov 17 '25 | Revision Request Comments |
| 134PGRR-12 GridCARE Comments 112025 | docx | Nov 20 '25 | Revision Request Comments |
| 134PGRR-13 ROS Ballot 120425 | xls | Dec 5 '25 | Revision Request Ballot |
| 134PGRR-14 ROS Report 120425 | docx | Dec 5 '25 | Committee Report |
| 134PGRR-15 Camus Energy Comments 120825 | docx | Dec 8 '25 | Revision Request Comments |
| 134PGRR-16 Oncor Comments 120925 | docx | Dec 9 '25 | Revision Request Comments |
| 134PGRR-17 V-Wire Comments 020626 | docx | Feb 6 '26 | Revision Request Comments |
| 134PGRR-18 Request for Withdrawal 052726 | docx | May 27 '26 | Revision Request |
Meetings That Took It Up 8
| Date | Meeting | Committee | Status |
|---|---|---|---|
| May 7 '26 | ROS Meeting | ROS | Concluded |
| Apr 2 '26 | ROS Meeting | ROS | Concluded |
| Mar 5 '26 | ROS Meeting | ROS | Concluded |
| Feb 5 '26 | ROS Meeting | ROS | Concluded |
| Jan 8 '26 | ROS Meeting | ROS | Concluded |
| Dec 15 '25 | CMWG Meeting - Webex Only | CMWG | Concluded |
| Dec 4 '25 | ROS Meeting - Webex Only | ROS | Concluded |
| Nov 6 '25 | ROS Meeting - Webex Only | ROS | Concluded |