Meeting · ROS
ROS Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Boardrooms A and B
VirtualWebEx / Teams
Dial-in877-668-4493
Revision Requests On The Agenda
NOGRR273NOGRR282NOGRR283NOGRR284NOGRR286NPRR1264NPRR1272NPRR1278NPRR1284NPRR1286NPRR1295NPRR1306NPRR1308NPRR1309NPRR1310NPRR1317NPRR1319NPRR956PGRR073PGRR115PGRR122PGRR123PGRR124PGRR126PGRR128PGRR130PGRR133PGRR134PGRR136PGRR138PGRR140PGRR141PGRR142PGRR143PGRR144PGRR145RRGRR038
Agenda 67 items
- 1. Antitrust Admonition — Sandeep Borkar · 9:30 a.m.
-
2.
Agenda Review
— Sandeep Borkar
- 02. ROS Agenda 20260402 · Meeting Agenda
- 3. Approval of ROS Meeting Minutes Vote — Sandeep Borkar
-
March 5, 2026
- 03. Draft Minutes ROS 20260305 · Meeting Minutes
- 4. Technical Advisory Committee (TAC) Update — Sandeep Borkar
- 5. ERCOT Reports and Updates · 9:40 a.m.
-
Operations Report
— Alex Lee
- 05. February 2026 ERCOT Operations Report Public.v2 · Staff Report
-
System Planning Report
— Ping Yan
- 05. SystemPlanningROS_Feb2026 · Staff Report
-
Far West Texas Import Generic Transmission Constraint (GTC) Exit Strategy Update
— Priya Ramasubbu
- 05. FW TX Import GTC Exit Strategy_04022026 · Staff Report
- 6. ROS Revision Requests Vote — Sandeep Borkar · 10:10 a.m.
- Impact Analysis
- PGRR143, Steady State Planning Schedule Posting Location Update
- Language Review
- NOGRR286, Addition of 765-kV Operational Voltage Limits
-
PGRR145, Batch Zero Process for Large Load Interconnections
- 06. ROS-Large Load Batch Study Workshop Update 04022026 · Project Documents
- 7. System Protection Working Group (SPWG) — Uchenna Ndusorouwa · 11:10 a.m.
-
8.
Operations Working Group (OWG)
— Rickey Floyd
· 11:20 a.m.
- 08. OWG_ROS_ 20260402 · Stakeholder Presentation
-
9.
Planning Working Group (PLWG)
— Mina Turner
· 11:30 a.m.
- 09. Planning Working Group update 03052026.v2 · Committee Report
- Break · 11:40 a.m.
- 10. Tabled Revision Requests Vote — Sandeep Borkar · 11:50 a.m.
- NOGRRs
- NOGRR273, Related to NPRR1264, Creation of a New Energy Attribute Certificate Program
-
NOGRR282, Board Priority - Large Electronic Load Ride-Through Requirements (DWG) (SPWG)
— Patrick Gravois
- ROS 20260402 Ballot NOGRR282 recommend approval · Revision Request Ballot
- ROS 20260402 Ballot NOGRR282 table · Revision Request Ballot
- 10. NOGRR282_NPRR1308_April ROS_final · Staff Report
- NOGRR283, Board Priority - Related to NPRR1309, Dispatchable Reliability Reserve Service Ancillary Service
- NOGRR284, Related to NPRR1310, Dispatchable Reliability Reserve Service Plus Energy Storage Resource Participation and Release Factor
- PGRRs
- PGRR073, Related to NPRR956, Designation of Providers of Transmission Additions
- PGRR122, Reliability Performance Criteria for Loss of Load (DWG, PLWG)
- PGRR123, Related to NPRR1264, Creation of a New Energy Attribute Certificate Program
- PGRR124, ESR Maintenance Exception to Modifications (DWG, PLWG)
- PGRR126, Related to NPRR1284, Guaranteed Reliability Load Process (PLWG)
- PGRR128, Regional Transmission Plan Review of Grid Enhancing Technologies (PLWG)
- PGRR130, Related to NPRR1295, GTC Exit Solutions (PLWG)
- PGRR133, Clarifying Legacy Generation Breaker Control for PGRR115 Implementation
- PGRR134, Interconnection Studies Reform for Dispatchable Loads (PLWG)
- PGRR136, Large Load Interconnection Study Scope Documentation
- PGRR138, Large Load Interconnection Study Review and Approval Process
- PGRR140, Related to NPRR1317, Creation of Non-Settled Generator (NSG) and Clarification of the Types, Usage, and Registration of Distributed Generation (NDSWG, PLWG)
- PGRR141, Large Load Interconnection Study Reform for Substantiated Load (PLWG)
- PGRR142, In-kind Definition for Generation (DWG, PLWG)
- PGRR144, Dynamic Model Submission and Review Requirements for Large Loads including Large Electronic Loads (DWG, PLWG)
- RRGRRs
- RRGRR038, Related to NPRR1264, Creation of a New Energy Attribute Certificate Program
- NPRRs
- NPRR1272, Voltage Support at Private Use Networks (PLWG, VPWG)
- NPRR1278, Establishing Advanced Grid Support Service as an Ancillary Service (OWG)
- NPRR1284, Guaranteed Reliability Load Process (PLWG)
- NPRR1286, Establish Multi-Value Criteria for Resiliency-Related Transmission Project Evaluation (PLWG)
- NPRR1295, GTC Exit Solutions (PLWG)
-
NPRR1308, Board Priority – Related to NOGRR282, Large Electronic Load Ride-Through Requirements
- ROS 20260402 Ballot NPRR1308 endorse · Revision Request Ballot
- 10. NOGRR282_NPRR1308_April ROS_final · Staff Report
- NPRR1317, Creation of Non-Settled Generator (NSG) and Clarification of the Types, Usage, and Registration of Distributed Generation (NDSWG, PLWG)
- NPRR1319, Modifications to Seasonal Mothball Periods and Clarification to Evaluation Process
-
11.
Combo Ballot Vote
— Sandeep Borkar
· 12:30 p.m.
- ROS 20260402 Ballot Combined · Revision Request Ballot
- 12. Black Start Working Group (BSWG) — Michael Dieringer · 12:40 p.m.
-
13.
Inverter-Based Resource Working Group (IBRWG)
— Julia Matevosyan
· 12:50 p.m.
- 13. IBRWG Report to ROS 040226 · Committee Report
- 14. Operations Training Working Group (OTWG) — Manuel Sanchez · 1:00 p.m.
-
15.
Performance, Disturbance, Compliance Working Group (PDCWG)
— Bracy Nesbit
· 1:10 p.m.
- 15. PDCWG Report to ROS_040226 · Committee Report
-
16.
Steady State Working Group (SSWG)
— Chris Ramirez
· 1:20 p.m.
- 16. SSWG_Update_ROS_04022026 · Committee Report
- 17. Other Business — Sandeep Borkar · 1:30 p.m.
- ISM2 Future Ready Program/NPRR1306 Update — Nisha Bhatia
- Review Open Action Items List
- No Report
- Dynamics Working Group (DWG)
- Meter Working Group (MWG)
- Network Data Support Working Group (NDSWG)
- Voltage Profile Working Group (VPWG)
- Adjourn — Sandeep Borkar · 1:50 p.m.
Ballots
| Body | RRs | Result | Yes | No | Abstain | |
|---|---|---|---|---|---|---|
| ROS | NOGRR283 NOGRR286 PGRR133 PGRR143 PGRR145 | Motion Carries | 7.5 | 0 | 0 | xls |
| ROS | NOGRR282 | Motion Carries | 6.75 | 0.5 | 8 | xls |
| ROS | NOGRR282 | Motion Fails | 0.5 | 6.75 | 3 | xls |
| ROS | NPRR1308 | Motion Carries | 6.75 | 0.5 | 3 | xls |
Documents 4
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| APPROVED Minutes ROS 20260402 | Meeting Minutes | doc | May 8 '26 |
| 17. ERCOT-ROS-2026-04-02-Market-Participant-Service-Portal-Updates 2 | Staff Report | pptx | Mar 26 '26 |
| Meeting Materials ROS 20260402 | zip | Apr 1 '26 | |
| Revision Requests ROS 20260402 | zip | Apr 1 '26 |