Meeting · PRS
PRS Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744
VirtualWebEx / Teams
Dial-in888-894-0587
Revision Requests On The Agenda
NPRR299NPRR300NPRR309NPRR312NPRR313NPRR314NPRR315NPRR319NPRR321NPRR322NPRR324NPRR327NPRR328NPRR332NPRR333NPRR334NPRR336NPRR337NPRR338NPRR340NPRR344NPRR345NPRR346NPRR347NPRR348NPRR349NPRR351NPRR354NPRR355NPRR356NPRR357NPRR358NPRR359NPRR360NPRR361NPRR362NPRR363NPRR364NPRR365NPRR366NPRR367NPRR368SCR761SCR762SCR763SCR765
Agenda 11 items
- 1. Antitrust Admonition — S. Morris
- 2. Replacement Election of PRS Vice Chair Vote — B. Albracht
-
3.
Approval of Minutes April 1, 2011 April 21, 2011 Vote
— S. Morris
- 03. DRAFT Minutes PRS 20110401 · Meeting Minutes
- 03. DRAFT Minutes PRS 20110421 · Meeting Minutes
- 4. Urgency Votes NPRR367, Shaping of PTP Options Taken to Real-Time to Match Forecasted Load NPRR368, Clarification of the Purpose of Point-to-Point Options Vote — S. Morris
- 5. TAC and Board Reports — S. Morris
-
6.
Project Update and Summary of Project Priority List (PPL) Activity to Date
— T. Anderson
- 06. PRS_May_2011_BusInt_Update · Project Documents
- 7. Review Recommendation Reports, Impact Analyses, Cost/Benefit Analyses, and Prioritization NPRR299, Remove Requirement for ERCOT Board Approval of PUCT, IMM, and FERC Required Reports NPRR313, Updating the Term Resource Plan to Current Operating Plan NPRR314, Requirement to Post Generation Resources Temporal Constraints NPRR319, Required Documentation to Recover Fuel Costs for RUC Deployments NPRR321, Allow Change to Energy Offer Curve MW Amounts in the Adjustment Period for Qualifying Facilities NPRR324, Conductor/Transformer Transmission Facility Rating NPRR328, Removes ERCOT Requirement For Reactive Resource Planning and the Associated Compliance Process NPRR332, Revise QSGR Processes for COP Reporting of QSGR Assigned Off-Line Non-Spin and Application of Emergency Operations Settlement NPRR333, Removal of Redundant Reporting Requirement Related to Equipment Ratings NPRR337, Correct Section Reference in Section 1.3.1.1 Pertaining To Protected Information of DC Ties NPRR338, Modifications to Support Revenue Neutrality NPRR344, Define RMR Fuel Adder NPRR346, Removal of Redundant Posting Requirement Related to Electrical Bus Changes NPRR347, Counter-Party Invoice and Single Daily Settlement Invoice SCR761, Provide Price Republication Notifications via API and Provide Price Corrections via XML SCR762, Enable a Single Step Cancel/Resubmit of Trades SCR763, Modify COP Validation Rule for RRS SCR765, Public Aggregated Wind Dashboard - Urgent Vote — S. Morris
- 8. Review of Nodal Protocol Revision Requests (NPRRs) Language NPRR300, Municipal Owned Utility Addition to Determination of Total Potential Exposure for a Counter-Party NPRR309, Providing STWPF to QSEs Contractually Affiliated with WGR NPRR312, Clarification of QSE Requirements for Split Generation Resources Urgent NPRR315, Revision of Responsive Reserve Measure to Net Dependable Capability Urgent NPRR322, Real-Time PTP Option Modeling NPRR327, State Estimator Data Redaction Methodology NPRR334, Incorporate Resource Limit for the Amount of Regulation Service that May be Provided from a Generation Resource During Any Operating Hour NPRR336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather NPRR340, Unannounced HSL Test for Duration-Limited Resources Urgent NPRR345, EILS Availability Calculation Post-Depletion NPRR348, Generation Resource Start-Up and Shut-Down Process NPRR349, Clarification of Ancillary Service Provider’s Responsibilities, Addition of Penalty Factor Charge for Failure to Provide, and Addition of Ancillary Service Capacity Compliance Performance Criteria NPRR351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes NPRR354, Revisions to Non-Spin Performance Criteria Language and Provision for ICCP Telemetry of Non-Spin Deployment NPRR355, Adjust the Calculation of the Real-Time Settlement Point Price for a Load Zone NPRR356, EEA Changes Related to Dispatch Instructions and BLTs NPRR357, Multi-Month CRR Auction and Revisions to Collateral Requirements NPRR358, Clarification of Responsible Entity for Binding Obligations NPRR359, Monthly TDSP Load Report NPRR360, Summary Report of HDL and LDL NPRR361, Real-Time Wind Power Production Data Transparency NPRR362, Changes to PRC Calculation NPRR363, Revision to EEA Level 2B ERCOT Requirements During the EILS VDI NPRR364, Clarify Active and Inactive SCED Constraint Reporting NPRR365, Change in Resource Outage Approvals from Eight to 90 Days NPRR366, Generation Resource Power Factor Criteria Clarification Vote — S. Morris
- 9. Notice of Withdrawal — S. Morris
-
10.
Other Business 2011 PRS Goals Vote
— S. Morris
- 10. 2011 PRS Goals DRAFT · Committee Report
- 11. Adjourn — S. Morris
Documents 2
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| APPROVED Minutes PRS 20110519 | Meeting Minutes | doc | Dec 17 '11 |
| 01. Agenda_PRS_051911 | Meeting Agenda | doc | May 12 '11 |