NPRR #366 · Revision Request

NPRR366  Generation Resource Power Factor Criteria Clarification

Withdrawn sponsor LCRA posted 2011-05-04 ercot.com
ReasonThe current power factor criterion has the requirement for .95 power factor lagging for a Generation Resource at all voltage levels. In reality a Generation Resource cannot produce .95 lagging power factor at system high Voltage Profiles due to the resulting high voltages on the low side of the Generator Step-Up (GSU) and the associated downstream generation equipment. Likewise, the current power factor criterion has the requirement for .95 leading power factors for a Generation Resource at all voltage levels. In reality, a Generation Resource cannot produce .95 leading power factors at system low Voltage Profiles because of creating low voltages on the low side of the GSU and the associated downstream generation equipment. This NPRR adjusts the Generation Resource power factor criteria to .97 and 1.03, which is more in line with actual system performance.
Created2011-05-19
Sections Affected
2.13.153.15.1
Summary
This Nodal Protocol Revision Request (NPRR) adjusts the power factor criteria for Generation Resources to align with actual Generation Resource capabilities.
Action Log 1 milestones
Documents 10
NameTypePostedClassification
366NPRR-01 Generation Resource Power Factor Criteria Clarificati doc May 4 '11 Revision Request
366NPRR-02 LCRA Comments 051011 doc May 10 '11 Revision Request Comments
366NPRR-03 ROS Comments 051711 doc May 17 '11 Revision Request Comments
366NPRR-04 PRS Report 051911 doc May 23 '11 Committee Report
366NPRR-05 ROS Comments 062111 doc Jun 21 '11 Revision Request Comments
366NPRR-06 CenterPoint Energy Comments 030512 doc Mar 5 '12 Revision Request Comments
366NPRR-07 ERCOT Comments 030712 doc Mar 7 '12 Revision Request Comments
366NPRR-08 Calpine Comments 031212 doc Mar 12 '12 Revision Request Comments
366NPRR-09 AEP Comments 031212 doc Mar 12 '12 Revision Request Comments
366NPRR-10 Request for Withdrawal 041612 doc Apr 16 '12 Revision Request Comments
Meetings That Took It Up 22
DateMeetingCommitteeStatus
Apr 19 '12 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Mar 22 '12 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Mar 14 '12 NPRR366 Workshop ROS Concluded
Mar 8 '12 Reliability and Operations Subcommittee (ROS) Meeting ROS Concluded
Feb 23 '12 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Feb 16 '12 Reliability and Operations Subcommittee (ROS) Meeting ROS Concluded
Jan 19 '12 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded
Dec 15 '11 PRS Meeting PRS Concluded
Nov 17 '11 PRS Meeting PRS Concluded
Nov 10 '11 ROS Meeting ROS Concluded
Nov 9 '11 WMS Meeting WMS Concluded
Oct 20 '11 PRS Meeting PRS Concluded
Oct 13 '11 ROS Meeting ROS Concluded
Sep 22 '11 PRS Meeting PRS Concluded
Sep 15 '11 ROS Meeting ROS Concluded
Aug 18 '11 PRS Meeting PRS Concluded
Aug 11 '11 ROS Meeting ROS Concluded
Jul 21 '11 PRS Meeting PRS Concluded
Jun 23 '11 PRS Meeting PRS Concluded
Jun 16 '11 ROS Meeting ROS Concluded
May 19 '11 PRS Meeting PRS Concluded
May 12 '11 ROS Meeting ROS Concluded