NPRR #363 · Revision Request

NPRR363  Revision to EEA Level 2B ERCOT Requirements During the EILS VDI

Rejected sponsor APX Power Markets posted 2011-05-04 ercot.com
ReasonCurrently when issuing an EEA Level 2B VDI, ERCOT requests Market Participants to "curtail Load consistent with their commitments", and Market Participants not committed for all EILS Time Periods are required to consider the current Operating Hour and refer to the EILS Time Period definitions before choosing whether or not to respond. Additional verbiage from ERCOT during the EILS deployment VDI referencing the current EILS Time Period would eliminate any ambiguity in the instructions based on the current time, and improve response times for Market Participants that are not contracted for all EILS Time Periods.
Created2011-05-19
Rejected2011-06-23
Sections Affected
6.5.9.4.2
Summary
This Nodal Protocol Revision Request (NPRR) adds an additional requirement for ERCOT to indicate which time period is being dispatched during their Emergency Interruptible Load Service (EILS) Verbal Dispatch Instruction (VDI) to the Qualified Scheduling Entity (QSE) Hotline during EEA Level 2B.
Action Log 2 milestones
Documents 4
NameTypePostedClassification
363NPRR-01 Revision to EEA Level 2B ERCOT Requirements During th doc May 4 '11 Revision Request
363NPRR-02 PRS Report 051911 doc May 23 '11 Committee Report
363NPRR-03 ERCOT Comments 060611 doc Jun 6 '11 Revision Request Comments
363NPRR-04 PRS Report 062311 doc Jun 28 '11 Committee Report
Meetings That Took It Up 7
DateMeetingCommitteeStatus
Sep 1 '11 TAC Meeting TAC Concluded
Aug 11 '11 ROS Meeting ROS Concluded
Jul 20 '11 Operations Working Group (OWG) Meeting OWG Concluded
Jul 7 '11 TAC Meeting TAC Concluded
Jun 23 '11 PRS Meeting PRS Concluded
Jun 15 '11 Operations Working Group (OWG) Meeting OWG Concluded
May 19 '11 PRS Meeting PRS Concluded