Revision Requests On The Agenda
NOGRR215NOGRR223NOGRR226NOGRR227NPRR1056NPRR1070NPRR1077NPRR1084NPRR1085NPRR956NPRR995PGRR073PGRR092PGRR093PGRR094RRGRR029RRGRR030RRGRR031
Agenda 49 items
- 1. Antitrust Admonition — Chase Smith · 9:30 a.m.
- 2. Agenda Review — Chase Smith
- 3. Approval of ROS Meeting Minutes Vote — Chase Smith · 9:35 a.m.
-
July 7, 2021
- 03. Draft Minutes ROS 20210708 · Meeting Minutes
- 4. Technical Advisory Committee (TAC) Update — Chase Smith · 9:40 a.m.
- 5. ERCOT Reports · 10:00 a.m.
-
Operations Report
— ERCOT Staff
- June 2021 ERCOT Operations Report Public · Staff Report
-
System Planning Report
— Ping Yan
- SystemPlanningROS Jun2021 · Staff Report
- 6. New Protocol Revision Subcommittee (PRS) Referrals Vote — Chase Smith · 10:10 a.m.
- NPRR1084, Improvements to Reporting of Resource Outages and Derates
- NPRR1085, Ensuring Continuous Validity of Physical Responsive Capability (PRC) and Dispatch through Timely Changes to Resource Telemetry and Current Operating Plans (COPs)
- 7. Revision Requests Tabled at PRS, Referred to ROS Vote — Chase Smith · 10:30 a.m.
- NPRR1077, Extension of Self-Limiting Facility Concept to Settlement Only Generators (SOGs) and Telemetry Requirements for SOGs
- 8. ROS Revision Requests Vote — Chase Smith · 10:45 a.m.
- Impact Analysis Review
- NOGRR227, Add Phasor Measurement Recording Equipment Location for Main Power Transformer for Intermittent Renewable Resource (IRR)
- RRGRR030, Allow New Voltage Levels in Resource Registration Information
- RRGRR031, Related to NPRR995, RTF-6 Create Definition and Terms for Settlement Only Energy Storage
- Language Review
- PGRR094, Clarify Notification Requirement for Generator Construction Commencement or Completion
- 9. Revision Requests Tabled at ROS Vote — Chase Smith · 11:15 a.m.
- PGRR073, Related to NPRR956, Designation of Providers of Transmission Additions
- Break · 11:20 a.m.
- 10. Planning Working Group (PLWG) — Charles DeWitt · 11:30 a.m.
-
NPRR1056, Market Impact Generic Transmission Constraint (GTC) Notification (OWG/PLWG) Vote
- 10. 08052021 Planning Working Group Update · Committee Report
-
NPRR1070, Planning Criteria for GTC Exit Solutions (OWG/PLWG) Vote
- 10. 08052021 Planning Working Group Update · Committee Report
-
PGRR093, Replace Inadvertent Deletions in Section 5 Vote
- 10. 08052021 Planning Working Group Update · Committee Report
- 11. Operations Working Group (OWG) — Rickey Floyd · 11:45 a.m.
-
PGRR092, Related to NPRR1077, Extension of Self-Limiting Facility Concept to Settlement Only Generators (SOGs) and Telemetry Requirements for SOGs (OWG) Vote
- 11. Operations Working Group ROS 20210805 · Committee Report
-
RRGRR029, Related to NPRR1077, Extension of Self-Limiting Facility Concept to Settlement Only Generators (SOGs) and Telemetry Requirements for SOGs (OWG) Vote
- 11. Operations Working Group ROS 20210805 · Committee Report
-
NOGRR215, Limit Use of Remedial Action Schemes Vote
- 11. Operations Working Group ROS 20210805 · Committee Report
-
NOGRR223, Add Phasor Measurement Recording Equipment Requirement to Modified Generating Facilities in Interconnection Process Vote
- 2021 ROS Ballot NOGRR223 · Revision Request Ballot
- 11. Operations Working Group ROS 20210805 · Committee Report
-
NOGRR226, Revision to 5% Transmission Operator (TO) Load Shedding Relay Point (DWG, OWG, PDCWG) Vote
- 11. Operations Working Group ROS 20210805 · Committee Report
-
12.
Performance Disturbance Compliance Working Group (PDCWG)
— Chad Mulholland
· 12:05 p.m.
- 12. PDCWG Report to ROS 080521 · Committee Report
- 12. PDCWG Emergency Conditions List Discussion Summary 07 16 21 · Meeting Minutes
- 13. Network Data Support Working Group (NDSWG) — J-M Yatar · 12:15 p.m.
-
NDSWG Scope Vote
- 13. NDSWGscope2021 PROPOSAL NDSWG EDITS · Legal filings and governance
-
14.
Combo Ballot Vote
— Chase Smith
· 12:30 p.m.
- 2021 ROS COMBO Ballot AUGUST · Revision Request Ballot
-
15.
Planning Geomagnetic Disturbance Task Force (PGDTF)
— Chu Liang
· 12:35 p.m.
- 15 PGDTF Update ROS 08 05 2021 · Committee Report
-
16.
Steady State Working Group (SSWG)
— Chenyan Guo
· 12:45 p.m.
- 16. SSWG Report to ROS Aug 05 2021 Final · Committee Report
-
17.
System Protection Working Group (SPWG)
— Vincent Roberts
· 12:55 p.m.
- 17. SPWG Update to ROS 2021 08 05 · Committee Report
- 18. Voltage Profile Working Group (VPWG) — Scot Williams · 1:05 p.m.
- 19. Other Business — Chase Smith · 1:15 p.m.
- Permanent Metering Exemption Request per Protocols Section 10.14 — Bill Barnes
- Review Open Action Items List
- No Report:
- Black Start Working Group (BSWG)
- Dynamic Working Group (DWG)
- Operations Training Working Group (OTWG)
- Adjourn — Chase Smith · 1:45 p.m.
Ballots
| Body | RRs | Result | Yes | No | Abstain | |
|---|---|---|---|---|---|---|
| ROS | NOGRR223 | Motion Carries | 4.5 | 0 | 13 | xls |
| ROS | NOGRR227 NPRR1084 NPRR1085 PGRR093 PGRR094 RRGRR030 RRGRR031 | Motion Carries | 7.5 | 0 | 0 | xls |
Documents 5
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| APPROVED Minutes ROS 20210805 | Meeting Minutes | doc | Sep 17 '21 |
| 02. Agenda ROS 20210805 | Meeting Agenda | docx | Jul 29 '21 |
| ERCOT SCT Directive Working Group Assignments v08012021 | Project Documents | pptx | Aug 3 '21 |
| Meeting Materials ROS 20210805 | zip | Aug 5 '21 | |
| Revision Requests ROS 080521 | zip | Aug 4 '21 |