Revision Requests

12 of 2394 shown
Type
⚑ Urgent only
Title Sponsor Next Filed Last action ▾
PGRR141 Large Load Interconnection Study Reform for Substantiated Load Joint Sponsors Withdrawn Dec 31 '25 Feb 5 '26
PGRR136 Large Load Interconnection Study Scope Documentation Schaper Energy Consulting Withdrawn Nov 25 '25 Jan 8 '26
PGRR138 Large Load Interconnection Study Review and Approval Process Schaper Energy Consulting Withdrawn Dec 1 '25 Jan 8 '26
PGRR134 Interconnection Studies Reform for Dispatchable Loads Luminary Strategies Withdrawn Nov 1 '25 Dec 4 '25
PGRR135 Large Load Interconnection Queue Process Revision Cholla Petroleum Withdrawn Nov 4 '25 Nov 4 '25
PGRR105 Deliverability Criteria for DC Tie Imports Rainbow Energy... Withdrawn Apr 17 '23 May 22 '24
PGRR111 Related to NPRR1191, Registration, Interconnection, and Operation of Customers with Large Loads; Information Required of Customers with Loads 25 MW or Greater ERCOT Withdrawn Aug 1 '23 Sep 7 '23
PGRR097 Related to NPRR1098, Direct Current Tie (DC Tie) Reactive Power Capability Requirements ERCOT Withdrawn Sep 29 '21 Nov 4 '21
PGRR028 Evaluation of Compliance with Reactive Requirements ERCOT Withdrawn Feb 12 '13 Jun 5 '14
PGRR035 DC Tie Interconnection Process John Moore on behalf... Withdrawn Nov 4 '13 Nov 22 '13
PGRR034 Asynchronous Tie Interconnection Process Pattern Energy Withdrawn Oct 8 '13 Oct 23 '13
PGRR003 New Planning Guide Section 9A, SSWG Procedure Manual Planning Working Group (PLWG) Withdrawn Nov 23 '10 May 26 '11