Meeting · OWG
OWG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Room 168
VirtualWebEx / Teams
Dial-in877-668-4493
Revision Requests On The Agenda
Agenda 6 items
- 1. Antitrust Admonition — Warren · 9:30 am
- 2. ROS Meeting Report -- — Warren · 9:35
- 3. NOGRRs for review and language changes: NOGRR143, NOGRR145, NOGRR147 and NPRR713 (associated to NOGRR147). NOGRR143 Alignment of Nodal Operating Guides with NERC Reliability Standard, BAL-001-TRE-1. This Nodal Operating Guide Revision Request (NOGRR) aligns the Nodal Operating Guides with North American Electric Reliability Corporation (NERC) Reliability Standard, BAL-001-TRE-1. [PDCWG] NOGRR145 Alignment with NPRR705. Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook, the term "commercial Operations" has a different meaning to Resource Entities and financial institutions involved in construction and financing of Generation Resources than it does in the context of performance testing by ERCOT for new Generation Resources. This Nodal Operating Guide Revision Request (NOGRR) aligns the Nodal Operating Guides with NPRR705 by replacing various terms used to refer to the date on which Generation Resources complete the Resource interconnection process with the proposed defined terms "Commercial Operations Date" and "Resource Commissioning Date" to provide consistency for references to the end of the generation interconnection process. [ERCOT](Possible vote.) NOGRR147 Reactive Power Testing Requirements. This Nodal Operating Guide Revision Request (NOGRR) revises the language in Section 3.3.2.1, Corrected Unit Reactive Limits (CURL), to harmonize the ERCOT reactive testing requirements with the recently approved North American Electric Reliability Corporation (NERC) Reliability Standards. [Luminant] NPRR713 Reactive Power Testing Requirements. This Nodal Protocol Revision Request (NPRR) revises the language in Section 8.1.1.2.1.4, Voltage Support Service Qualification, to reference the reactive power testing requirements in the Nodal Operating Guides and reflect the revisions to harmonize the Nodal Protocol requirements with recently approved North American Electric Reliability Corporation (NERC) Reliability Standards. [Luminant](language review) Vote — All
- 4. ERCOT System Operations Report — ERCOT
-
5.
2016 AS Methodology Changes
— Bill Blevins
- OWG AS Methodology Changes for 2016 · Staff Report
- 6. Future Meeting Date: October 22nd ERCOT Met Center room 168. — Warren