Meeting · OWG
OWG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Room 168
VirtualWebEx / Teams
Dial-in877-668-4493
Revision Requests On The Agenda
Agenda 12 items
- 1. Antitrust Admonition — Owens · 9:30 a.m.
- 2. ROS Meeting Report - NOGRR134 passed ROS by email vote, the NOGRR is scheduled for consideration at the August 28, 2014 TAC meeting. — Owens
-
3.
OWG meeting notes approval: July meeting notes review and approval.
— All
- OWG_MeetingNotes_072214 · Meeting Minutes
- 4. NOGRRs for review and language changes: 132NOGRR Automatic Under-Voltage and Under-Frequency Load Shedding Protection Systems - Load Restoration. This NOGRR adds a requirement for Under-Frequency Load Shedding (UFLS) and Under-Voltage Load Shedding (UVLS) systems Load restoration coordination consistent with that of manually shed Load for EEA 3 or Constraint Management Plan. [ERCOT] IA Review 135NOGRR Constraint Management During Energy Emergency Alerts. This Nodal Operating Guide Revision Request (NOGRR) seeks to improve management of congestion during an Energy Emergency Alert (EEA) by proposing: Language that provides a mechanism for ERCOT Operations to manage constraints in EEA 2 or 3 to higher Facility ratings when applicable for those constraints identified as limiting generation output; and Language that reconsiders use of double-circuit contingencies during emergency operations based on Grid conditions [ERCOT]Language Review 136NOGRR Verifying QSE Capability to Operate in CFC. This Nodal Operating Guide Revision Request (NOGRR) establishes a process for ERCOT to conduct Constant Frequency Control (CFC) tests to ensure that Qualified Scheduling Entities (QSEs) can provide this service if ERCOT loses its ability to control system frequency; and removes the CFC definition from the Nodal Operating Guide due to the definition being incorporated into the Protocols via associated NPRR646. [ERCOT] Language Review — All
- 5. Operations Report Monthly Operations Report Summary/Questions — ERCOT
- 6. Operations Task Force Report Action Items: — Tammar
- 7. Texas RE Update Report Standards Updates — Penney
- 8. System Operations Report Operating Procedure changes that impact market participants. — ERCOT
- 9. Seminar Task Force Report OTS report — ERCOT
-
10.
Other: Possible review of draft NPRR and NOGRR on VoltageControl Requirements. Continued Discussions Status update on SCR780 project ERCOT VSS Tool Training for TSPs
— Group ERCOT ERCOT/Blevins
- CREZ-VSS Presentation_TSP_Workshop · Stakeholder Presentation
- 11. Future Meeting Date: September 24th ERCOT Met Center room 168. — Owens
- Adjourn — Owens · 3:30 p.m.
Documents 1
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| OWG August Agenda 08192014 | Meeting Agenda | doc | Aug 15 '14 |