Meeting · PLWG
PLWG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Rooms A and B
VirtualWebEx / Teams
Dial-in877-668-4493
Revision Requests On The Agenda
Agenda 12 items
- 1. Antitrust Admonition — Chair · 5 min
- 2. Agenda Review — Chair · 5 min
- 3. Review of PLWG Meeting Minutes (Sept 23) — Chair · 5 min
-
4.
General updates At the Oct 3 ROS meeting, ROS assigned the following revision request to PLWG for review: NPRR1247 – Incorporation of Congestion Cost Savings Test in Economic Evaluation of Transmission Projects PGRR119 – PGRR119, Stability Constraint Modeling Assumptions in the Regional Transmission Plan 2025 PLWG meetings, RPG/PLWG joint meetings or standalone. Leadership ‘25
— Chair
· 5 min
- Congestion Cost Savings Test Evaluation Guideline Draft V2 redline · Official Guides and Manuals
- 5. PGRR115 (related to NPRR1234) – Interconnection Requirements for Large Loads and Modeling Standards for Loads 25 MW or Greater 115PGRR-11 AEP Comments 100424 — PLWG AEP · 50 min
- 6. PGRR117 – Addition of Resiliency Assessment and Criteria to Reflect PUCT Rule Change — PLWG · 30 min
-
7.
NPRR1247 – Incorporation of Congestion Cost Savings Test in Economic Evaluation of Transmission Projects 1247NPRR-03 TIEC Comments 091124 1247NPRR-06 AEPSC Comments 100324
— ERCOT TIEC AEPSC
· 50 min
- Congestion Cost Savings Test Evaluation Guideline Draft V2 redline · Official Guides and Manuals
- 8. PGRR119 – PGRR119, Stability Constraint Modeling Assumptions in the Regional Transmission Plan — ERCOT · 20 min
- 9. NERC Topics Roundtable (future topics): CIP-014-4 - Physical Security (topic pending new draft) TPL-008 - Transmission System Planning Performance Requirements for Extreme Temperature Events — PLWG · 5 min
- 10. Review Open Action Items — Chair · 10 min
- 11. Other business — Chair · 10 min
- 12. Adjourn — Chair
Documents 1
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| PLWG Notes 10162024 FINAL | Meeting Minutes | doc | Nov 1 '24 |