Meeting · MWG
MWG Meeting by Webex only
Revision Requests On The Agenda
Agenda 16 items
- 1. Anti-Trust Admonition and Introduction — D. Breshears · 9:00 AM
- 2. Introduction of Chair/Vice Chair — D. Tucker · 9:05 AM
- 3. Update on NPRR1020 and SMOGRR024 — D. Tucker · 9:10 AM
- 4. Loss of Telemetry Update — S. Nuckolls · 9:30 AM
-
5.
Update on Line Loss Compensation Language Changes
— D. Tucker
· 9:50 AM
- 5. Line Loss Compensation Language Draft · Revision Request
- 6. Discuss requests being received for connecting ESR (BESS) Auxiliary Loads to a throw over scheme to determine if the MWG has an interest in presenting the concept to WMS for direction to investigate — D. Tucker · 10:00 AM
- 7. Discuss requests being received for Metering Auxiliary Loads instead of the WSL behind a POI to determine if the MWG has an interest in presenting the concept to WMS for direction to investigate — D. Tucker · 10:30 AM
- 8. Discuss the possible utilization of TDSP Metering for EPS Metered Generation connected to a DSP system to determine if the MWG has an interest in presenting the concept to WMS for direction to investigate — D. Tucker · 11:00 AM
-
9.
Reports on EPS Activities
— S. Nuckolls/D. Maul
· 11:30 AM
- 9. Reports on EPS Meter Activities Mar2021 · Staff Report
- 10. Standing reminder on NPRR949 implementation date of 1/1/2023 — D. Breshears · 11:45 AM
- 11. New or other Business Items — D. Breshears · 12:00 PM
- 12. Meeting Summary and Closing Remarks — D. Breshears · 12:10 PM
- End of Meeting · 12:15 PM
- Deferred Open Action Items List
- Voltage throw over schemes
- Design proposal update to remove RARF
Documents 2
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| Meter Working Group | Stakeholder Presentation | pptx | Mar 25 '21 |
| MWG Meeting Notes 3 31 21 | Meeting Minutes | docx | Apr 2 '21 |