Meeting · MWG
MWG Meeting
VirtualWebEx / Teams
Dial-in877-668-4493
Revision Requests On The Agenda
Agenda 13 items
- 1. Anti-Trust Admonition — G. Godinez · 9:00 – 9:05
- 2. Attendance roll-call and introduction — G. Godinez · 9:05 – 9:10
- 3. Review of action items to be discussed at a Future Meeting — G. Godinez · 9:10 – 9:20
- 4. Standing reminder on NPRR949 implementation date 1/1/2023 — D. Tucker · 9:20 – 9:25
- 5. Update on SMOGRR for instrument transformer nameplate photo requirements — D. Tucker · 9:25 – 9:30
- 6. Tesla update on status and details for incorporating a telemetry signal into an EPS Meter — Tesla · 9:30 – 10:15
-
7.
Discuss forms required to supplement NPRR 1020
— G. Godinez
· 10:15 – 11:30
- 7A. EPS Metering Design Proposal Section D 8 18 MWG Edits · Forms and Templates
- 7A. EPS Metering Design Proposal Section D.DOC · Forms and Templates
- 7B. EPS Metering Design Proposal Section D Instructions · Forms and Templates
- 7B. EPS Metering Design Proposal Section D Instructions 8 18 MWG Edits · Forms and Templates
- 7C. EPS Site Certification Form · Forms and Templates
- 7D. EPS Meter Test Report · Forms and Templates
- 7E. ERCOT Polled Settlement MDAS Configuration Form · Forms and Templates
- 7F. Resouce Entity Access to Auxiliary Load Telemetry Sytem Notification... · Forms and Templates
- 7F. Resouce Entity Access to Auxiliary Load Telemetry Sytem 8 18 MWG Edi... · Forms and Templates
- Metersetup presentation MWG NPRR1020 · Stakeholder Presentation
-
8.
Distribution losses created by an ESR (battery/ESS) receiving WSL treatment
— D. Disanto
· 11:30 – 12:00
- 8. WSL Ercot MWG · Stakeholder Presentation
- Lunch break · 12:00 – 12:30
-
9.
Discuss updates to SMOG required to supplement NPRR 1020
— G. Godinez D. Tucker
· 12:30 – 2:30
- 9A. DRAFT SMOGRR to Implement NPRR1020 v081420 · Revision Request
- 9A. DRAFT SMOGRR to Implement NPRR1020 v081420 8 18 MWG Edits · Revision Request
- 9B. SMOG Appendix D Draft · Forms and Templates
- 9B. SMOG Appendix D Draft 8 18 MWG Edits · Forms and Templates
- Metersetup presentation MWG NPRR1020 · Stakeholder Presentation
- 10. New or other business items — G. Godinez · 2:30 – 2:45
- 11. Meeting Summary and Closing Remarks — G. Godinez · 2:45 – 3:00
- End of Meeting · 3:00 pm
Documents 3
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| Meter Working Group 18Aug20 | Stakeholder Presentation | pptx | Aug 14 '20 |
| MWG Agenda August 18 2020 | Meeting Agenda | doc | Aug 12 '20 |
| MWG Meeting Notes 8 18 20 | Meeting Minutes | docx | Aug 20 '20 |