NOGRR #43 · Revision Request

NOGRR043  Synchronization with OGRR208,Voltage Ride-Through (VRT) Requirement

Approved sponsor Warren Lasher posted 2010-06-04 ercot.com
ReasonCurrently, operational voltage requirements for Resources are embedded in Section 6.2.5.3.6, Automatic Under-Voltage Load Shedding (UVLS) Protection Systems, and wind VRT requirements are omitted.
Created2010-07-21
Sections Affected
2.9Voltage Ride-Through Requirements (new) 2.9.1Additional Voltage Ride-Through Requirements for Wind Generation Resources (new) 3.3Resource Entities 6.2.5.3.6Automatic Under-Voltage Load Shedding (UVLS) Protection Systems
Summary
This Nodal Operating Guide Revision Request (NOGRR) relocates generator voltage requirements from Section 6, Disturbance Monitoring and System Protection, to Section 2, System Operation and Control Requirements, and establishes Voltage Ride-Through (VRT) requirements for Wind Generation Resources (WGRs) to synchronize with the zonal Operating Guides. Clarifications to Resource Entity responsibilities regarding reactive capability and communication of changes have also been made.
Action Log 4 milestones
Amendments
DateBodyMotionResult
Jul 21 '10OWG In consensus to recommend approval of NOGRR043 as amended by the 7/8/10 ERCOT comments and as revised by OWG.Passed
Sep 16 '10ROS To recommend approval of NOGRR043 as recommended by OWG in the 8/18/10 OWG Report and as revised by ROS.Passed
Documents 11
NameTypePostedClassification
043NOGRR-01 Synchronization with OGRR208 Voltage Ride-Through (V doc Jun 4 '10 Revision Request
043NOGRR-02 CEO Revision Request Review 060410 doc Jun 4 '10 Revision Request Comments
043NOGRR-03 Impact Analysis 060410 doc Jun 4 '10 Staff Report
043NOGRR-04 ERCOT Comments 070810 doc Jul 8 '10 Revision Request Comments
043NOGRR-05 OWG Recommendation Report 072110 doc Jul 26 '10 Committee Report
043NOGRR-06 OWG Report 081810 doc Aug 19 '10 Committee Report
043NOGRR-07 Horizon Wind Energy Comments 083110 doc Aug 31 '10 Revision Request Comments
043NOGRR-08 ERCOT Comments 091310 doc Sep 13 '10 Revision Request Comments
043NOGRR-09 E. ON Climate & Renewables Comments 091610 doc Sep 16 '10 Revision Request Comments
043NOGRR-10 ROS Report 091610 doc Sep 17 '10 Committee Report
043NOGRR-11 TAC Report 100710 doc Oct 8 '10 Committee Report
Meetings That Took It Up 13
DateMeetingCommitteeStatus
May 18 '11 Operations Working Group (OWG) Meeting OWG Concluded
Apr 20 '11 OWG Meeting OWG Concluded
Mar 7 '11 OWG Meeting OWG Concluded
Feb 16 '11 OWG Meeting OWG Concluded
Jan 19 '11 OWG Meeting OWG Concluded
Dec 15 '10 OWG Meeting OWG Concluded
Nov 18 '10 OWG Meeting OWG Concluded
Oct 20 '10 OWG Meeting OWG Concluded
Oct 7 '10 TAC Meeting TAC Concluded
Sep 23 '10 OWG Meeting OWG Concluded
Sep 16 '10 ROS Meeting ROS Concluded
Aug 18 '10 OWG Meeting OWG Concluded
Jul 21 '10 OWG Meeting OWG Concluded