Meeting · OWG
OWG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Room 168
Revision Requests On The Agenda
Agenda 12 items
- Antitrust Admonition — Owens · 9:30 AM
- 1. ROS meeting Report - 049NOGRR Alignment with NERC Reliability Standard PRC-001-1, System Protection Coordination. Approved by ROS — Owens
-
2.
OWG meeting note’s approval
— ALL
- OWG_Meeting_Notes_102010 · Meeting Minutes
- 3. OGRRs and NOGRRs for review and language changes: 044NOGRR Clarification of a PSS In-Service. This Nodal Operating Guide Revision Request (NOGRR) clarifies that a Power System Stabilizer (PSS) must be On and in an active MW range to be considered in service. This NOGRR also updates the specific dates of PSS installation from 2008 to 2011. [LCRA] IA Review and vendor comments. Table for one month. ROS approved the NOGRR043 (OWG comments) as amended by ROS. ROS directed OWG to resolve the issue relating to the language change made in Section 2.9.1, 1)b): (note turbines was revised to WGRs) A draft NOGRR will be submitted to address this issue. ERCOT Planning and Wind Coalition. 052NOGRR Conductor/Transformer Facility Rating. This NOGRR adds the Conductor/Transformer rating normally used as Rate C in the Annual Planning Models as a fourth Transmission facility rating required to be provided by Transmission Service Providers (TSPs). [ERCOT] Language Consideration - Possible NDSWG Comments Tabled for one month. — ALL
- 4. Operations Report Monthly Operations Report Summary/Questions — ERCOT
- 5. Nodal Operating Guides Review and Revision Task Force Report. — Owens
- 6. Operations Task Force Report - update on Voltage Profile issues with +/- 2 % or +/- 5 % of nominal. Action for OTF to complete assignment. — Morris/Blackmer
- 7. Black Start Task Force Report — R. Kelm Kelly Blackmer
- 8. Compliance Report — Texas RE
- 9. System Operations — ERCOT
-
10.
Other items. Review draft NOGRR and NPRR for Black Start
— ALL
- Draft NOGRR-01 Black Start Definitions and New Black Start Plan · Revision Request
- Draft NPRR-01 New Definitions Related to Black Start 11xx10_Fina · Revision Request
- Adjourn — ALL