Meeting · OWG
OWG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Room 168
VirtualWebEx / Teams
Dial-in877-668-4493
Revision Requests On The Agenda
Agenda 12 items
- 1. Antitrust Admonition — Owens · 9:30 am
- 2. ROS Meeting Report Action Item — Owens
-
3.
OWG meeting notes approval: October meeting notes review and approval.
— All
- Operations Working Group Meeting_102214 revised · Meeting Minutes
- 4. NOGRRs for review and language changes: 135NOGRR Constraint Management During Energy Emergency Alerts. This Nodal Operating Guide Revision Request (NOGRR) seeks to improve management of congestion during an Energy Emergency Alert (EEA) by proposing: Language that provides a mechanism for ERCOT Operations to manage constraints in EEA 2 or 3 to higher Facility ratings when applicable for those constraints identified as limiting generation output; andLanguage that reconsiders use of double-circuit contingencies during emergency operations based on Grid conditions [ERCOT]Language Review 136NOGRR Verifying QSE Capability to Operate in CFC. This Nodal Operating Guide Revision Request (NOGRR) establishes a process for ERCOT to conduct Constant Frequency Control (CFC) tests to ensure that Qualified Scheduling Entities (QSEs) can provide this service if ERCOT loses its ability to control system frequency; and removes the CFC definition from the Nodal Operating Guide due to the definition being incorporated into the Protocols via associated NPRR646. ERCOT IA Review 138NOGRR Delete Grey Box for Reporting of Back-up Control Plan Submittal. This Nodal Operating Guide Revision Request (NOGRR) proposes the discontinuation of the posting requirement for Discontinue Backup Control Plan Submittal Results, ERCOT Market Information List (EMIL) ID, NP8-510M and Backup Control Plan Test Dates and Results Summary Reports, EMIL ID NP8-922-M. Language Review 139NOGRR Under/Over-Frequency Relaying Requirements. This Nodal Operating Guide Revision Request (NOGRR) adds over-frequency relaying requirements and clarifies under-frequency and over-frequency relay set-points so that Generation Resources know what is expected. Over-frequency relay set points criteria was approved by NERC in March 2014 under Standard PRC-024, Generator Frequency and Voltage Protective Relay Settings. ERCOT Language Review. 657NPRR Discontinue Backup Control Plan Submittal Results, Dispatch Instructions Compliance Metrics and Backup Control Plan Test Dates and Results Summary Reports Language Review ROS, Action Item. — All
-
5.
Operations Report Monthly Operations Report Summary/Questions
— ERCOT
- OWG Outage Data Additional Graphs · Staff Report
- OWG Outage Data Final · Staff Report
- 6. Operations Task Force Report Action Items: No Report — Tammar
- 7. Texas RE Update Report Standards Updates — Penney
- 8. System Operations Report Operating Procedure changes that impact market participants. — ERCOT
- 9. Seminar Task Force Report OTS report — ERCOT
-
10.
Other: 1. Review and discuss a draft NOGRR to amend the currently gray-boxed language of NOGRR084. 2. OWG take the NOGRR to ROS for approval Discuss submitting the draft NPRR and NOGRR on Voltage Control. 3. ERCOT to discuss Possible Voltage Control Workshop
— Julie Thomas (MISUG Chair) and ERCOT All ERCOT
- Voltage Workshop Concept · Stakeholder Presentation
- 11. Future Meeting Date: December 17th ERCOT Met Center room 206B. — Owens
- Adjourn — Owens · 3:30 pm
Documents 1
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| Operations_Working_Group_Meeting_111914 fjo comments | Revision Request Comments | doc | Jan 14 '15 |