Meeting · OWG
OWG Meeting by Webex Only
VirtualWebEx / Teams
Revision Requests On The Agenda
Agenda 15 items
- 1. Antitrust Admonition — R. Floyd
- 2. ERCOT Updates and System Operation Report — ERCOT Staff
- 3. Texas Reliability Entity Report — Texas RE Staff
- 4. NOGRR215 Limited Use of RAS — ERCOT
- 5. Emergency Condition list #5 NPRR1084 Improvements to Reporting of Resource Outages and Derates. — Ian Haley
- 6. Emergency Condition list #6 NPRR1085 Ensuring Continuous Validity of Physical Responsive Capability (PRC) and Dispatch through Timely Changes to Resource Telemetry and Current Operating Plans (COPs). — Lori Simpson
- 7. NOGRR226 Revision to 5% Transmission Operator (TO) Load Shedding Relay Set Point — LCRA
-
8.
NOGRR234 Related to NPRR1098, Direct Current Tie (DC Tie) Reactive Power Capability Requirements
— J. Bernecker
- 234NOGRR ERCOT Comments OWG Discussion 111821 · Revision Request Comments
- 234NOGRR ERCOT Comments OWG Discussion 111821 v2 · Revision Request Comments
- 1098NPRR ERCOT Comments OWG Discussion 111821 · Revision Request Comments
-
9.
NPRR1098, Direct Current Tie (DC Tie) Reactive Power Capability Requirements
— J. Bernecker
- 1098NPRR ERCOT Comments OWG Discussion 111821 · Revision Request Comments
- 10. Emergency Condition list #49 Energy Emergency Alert: Review EEA rules and assess if any changes are warranted. — Dave Detelich
- 11. #73 Should there be different PRC EEA trigger point & ORDC minimum reserves levels for winter and summer given potential for different events? — OWG
- 12. ECL #42 – Determine if NPRR1094 satisfies the revised language to the item. “Review under-frequency relay requirements to determine if changes are needed to improve TDSPs’ abilities to shed and rotate load.” — OWG
- 13. Emergency Condition list – Using Instant Messaging during EEA Events. — Kunkel/ERCOT
- 14. Other Business — R. Floyd
- 15. Adjourn — R. Floyd