Meeting · OWG
OWG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Room 168
Revision Requests On The Agenda
Agenda 12 items
- 1. Antitrust Admonition — Owens · 9:30 a.m.
- 2. ROS Meeting Report: NOGRR129, Implement Operational Preparedness for Geomagnetic Disturbances ROS Approved Vote — Owens
-
3.
OWG Meeting Notes Approval: May meeting notes review and approval.
— All
- OWG Meeting Notes 051914 fjo comments · Meeting Minutes
- 4. NOGRRs for review and language changes: 131NOGRR Clarification for Generation Resource during an EEA. This Nodal Operating Guide Revision Request (NOGRR) clarifies language that when ERCOT is in an Energy Emergency Alert (EEA), Qualified Scheduling Entities (QSEs) must receive authorization from ERCOT prior to manually removing an On-Line Resource. [ERCOT] IA Review 132NOGRR Automatic Under Voltage and Under Frequency Load Shedding Protection Systems Load Restoration. This NOGRR adds a requirement for Under-Frequency Load Shedding (UFLS) and Under-Voltage Load Shedding (UVLS) systems Load restoration coordination consistent with that of manually shed Load for EEA 3 or Constraint Management Plan. [ERCOT] Language Review 134NOGRR Posting Process for Black Start Plans. This NOGRR clarifies the responsibility of ERCOT to post the ERCOT Black Start plan on the Market Information System (MIS) Certified Area for Transmission Operators (TO) and post TOs’ new or revised Black Start plans on the MIS Certified Area for specified Market Participants. [ERCOT] Language Review — All
- 5. Operations Report Monthly Operations Report Summary Questions — ERCOT
- 6. Operations Task Force Report Action Items: — Tammar
- 7. Texas RE Update Report Standard Updates — Penney
- 8. System Operations Report Operating Procedure Changes that Impact Market Participants — ERCOT
-
9.
Seminar Task Force Report OTS Report
— ERCOT/Allgower
- Trainers Working Group Proposal (2) · Committee Report
- 10. Other: ROS Directive: Voltage support requirement for all Generation Resources greater than 20 MVA. (See Protocol Section 3.15, paragraph 2) Update on offline discussions. ERCOT Isabell is reviewing language submitted by Walter Possible review of draft NPRR and NOGRR on Voltage Control Requirements Update on EEA Workshop: ERCOT will update next meeting. — Walter/ERCOTSmall GroupWarren/ERCOT
- 11. Future Meeting Date: July 22nd ERCOT MET Center Room 168 — Owens
- Adjourn — Owens · 3:00 p.m.
Documents 2
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| 2014 HD Summary Report | Staff Report | ppt | Jun 26 '14 |
| OWG June Agenda 06252014 | Meeting Agenda | doc | Jun 19 '14 |