Meeting · PLWG
PLWG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 MET Boardrooms A and B
VirtualWebEx / Teams
Dial-in877-668-4493
Revision Requests On The Agenda
Agenda 22 items
- 1. Antitrust Admonition — Chair · 5 min
- 2. Agenda Review — Chair · 5 min
- 3. Review of PLWG Meeting Minutes (March) — Chair · 5 min
- 4. PGRR 128 -Regional Planning Group Review of Grid Enhancing Technologies — PLWG · 10 min
- TEBA comments (3/30)
- 5. PGRR 130 – Related to NPRR 1295, GTC Exit Solutions — PLWG · 10 min
- 6. PGRR 134 – Interconnection Studies Reform for Dispatchable Loads — Luminary Strategies · 10 min
- V-wires comments
- 7. PGRR 140 – Related to NPRR1317, Creation of Non-Settled Generator (NSG) and Clarification of the Types, Usage, and Registration of Distributed Generation, — ERCOT · 10 min
- 8. PGRR 141 -Large Load Interconnection Study Reform for Substantiated Load — Lancium · 5 min
- 9. PGRR 142 – In-kind Definition for Generation — Invergy · 20 min
- Invenergy Comments
- GridStor comments
- 10. PGRR 144 – Dynamic Model Submission and Review Requirements for Large Loads including Large Electronic Loads — ERCOT · 30 min
- Schaper Energy Consulting
- Data Center Coalition
- 11. NPRR 1286 – Establish Multi-Value Criteria for Resiliency-Related Transmission Project Evaluation — TIEC/ERCOT · 10 min
- TIEC Comments (3/10)
- Tabled Items
- 12. PGRR 126 - Related to NPRR1284, Guaranteed Reliability Load Process — Clayton Greer
- 13. PGRR 124 - ESR Maintenance Exception to Modification — Tesla
- 14. PGRR 122 – Reliability Performance Criteria for Loss of Load — ERCOT