Meeting · PLWG
PLWG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 MET Boardrooms A and B
VirtualWebEx / Teams
Dial-in877-668-4493
Revision Requests On The Agenda
Agenda 13 items
- 1. Antitrust Admonition — Chair · 5 min
- 2. Agenda Review — Chair · 5 min
- 3. Review of PLWG Meeting Minutes (December) — Chair · 5 min
- 4. PGRR 128 -Regional Planning Group Review of Grid Enhancing Technologies — PLWG · 10 min
- 5. PGRR 130 – Related to NPRR 1295, GTC Exit Solutions — PLWG · 10 min
- 6. PGRR 134 - Interconnection Studies Reform for Dispatchable Loads Oncor comments — Luminary Strategies · 20 min
-
7.
PGRR 140 - Related to NPRR1317, Creation of Non-Settled Generator (NSG) and Clarification of the Types, Usage, and Registration of Distributed Generation
— ERCOT
· 20 min
- NPRR1317-PGRR140 ERCOT Presentation · Staff Report
- 8. PGRR 141 -Large Load Interconnection Study Reform for Substantiated Load — Lancium · 20 min
- Tabled items
- 9. NPRR 1286 - Establish Multi-Value Criteria for Resiliency-Related Transmission Project Evaluation — TIEC/ERCOT
- 10. PGRR 126 - Related to NPRR1284, Guaranteed Reliability Load Process — Clayton Greer
- 11. PGRR 124 - ESR Maintenance Exception to Modification — Tesla
- 12. PGRR 122 – Reliability Performance Criteria for Loss of — ERCOT