NPRR #938 · Revision Request
NPRR938 Distribution Voltage Level Block Load Transfer (BLT) Compensation
- PRS withdrawn Jun 13 '19
- TAC —
- BOARD —
- PUCT —
ReasonAddresses current operational issues, Regulatory requirements
Created2019-06-13
Sections Affected
6.6.3.5
Summary
This Nodal Protocol Revision Request (NPRR) provides for the compensation of distribution voltage level Block Load Transfers (BLTs) that are instructed to switch from the ERCOT Control Area to a non-ERCOT Control area.
Timeline
-
Apr 26
PRSFiled by Golden Spread Electric Cooperative
-
Jun 13
PRS PRS MeetingPRSDeferred/Tabled Referred → WMS“to table NPRR938 and refer the issue to WMS” — Passed→ Language Consideration
- Jul 10
-
Jul 17
Listed without action at 1 meeting
- Aug 7
-
Aug 15
Listed without action at 8 meetings (Aug 15 '19 – Dec 12 '19)
- Jan 16
-
Jan 29
Listed without action at 1 meeting