Meeting · OWG
Operations Working Group (OWG) Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Room 168
Revision Requests On The Agenda
Agenda 11 items
- 1. Antitrust Admonition — Owens · 9:30 AM
- 2. ROS Meeting Report Did not meet — Owens
-
3.
OWG meeting note’s approval
— ALL
- OWG_MeetingNotes_111411 · Meeting Minutes
- 4. NOGRRs for review and language changes: 078NOGRR Real-Time Security Analysis Language Clean Up to Reconcile Operating Guides with Current Operation Practice. This NOGRR clarifies that the only security analysis studies that remain in the Nodal Operating Guides are the Real-Time security studies (given that Outage Planning is now covered in Protocol Section 3.1.5.1 and Transmission Planning is now covered in Planning Guide Section 4, Transmission Planning Criteria); and modifies the language to match current ERCOT Operations practice related to which contingencies are enforced in Real-Time operations. (Luminant) Language Review Tabled until further action is necessary. 083NOGRR Removal of Reporting Requirements for Vegetation-Related Line Outages. This Nodal Operating Guide Revision Request (NOGRR) deletes Section 3.7.2. [OWG] Review IA. 084NOGRR Daily Grid Operations Summary Report. This Nodal Operating Guide Revision Request (NOGRR) creates a summary level report of daily operational information to be posted on the Market Information System (MIS) Public Area. [MISUG] Language Review. 085NOGRR Replace TML References with MIS. This Nodal Operating Guide Revision Request (NOGRR) updates the Nodal Operating Guide to replace references to the Texas Market Link (TML) with the appropriate Market Information System (MIS) location. [ERCOT] Language Review. 086NOGRR Clarification of Seasonal Unit Capability Testing Requirements. This Nodal Operating Guide Revision Request (NOGRR) clarifies the seasonal unit capability testing requirement. [ERCOT] Language Review. Draft NPRR Remove the Operating Guide reference from 3.7 of the Protocols. Draft Review
- 5. Operations Report Monthly Operations Report Summary/Questions — ERCOT
- 6. Nodal Protocol and Guides Resolution Task Force Report. — Owens
- 7. Operations Task Force Report — Morris/Blackmer
-
8.
Compliance Report CIP-002 -009 version 4 vs. version 5. What is the difference between the two? Any updates you can give on these?
— Texas RE
- BSWG Presentation on CIP Version 5 · Stakeholder Presentation
- 9. System Operations Report Operating Procedure changes that impact market participants. — ERCOT
- 10. Other: Nominate and vote on leadership for 2012 chair and vice-chair. — ALL
- Adjourn — ALL · 3:00 PM