Meeting · LLWG
LLWG Meeting
LocationERCOT Austin 8000 Metropolis (Building E), Suite 100 Austin, TX 78744 Boardrooms A and B
VirtualWebEx / Teams
Dial-in877-668-4493
Revision Requests On The Agenda
Agenda 12 items
- 1. Antitrust Admonition — Bob Wittmeyer (Longhorn Power) · 9:30 am
- 2. NERC Action Update on LCL Issues — Mark Henry (Texas RE) · 9:35 am
- 3. Large Load Interconnection Queue — Agee Springer (ERCOT) · 9:50 am
-
4.
Batch Study Brief Update
— Matt Mereness (ERCOT)
· 10:40 am
- Agenda_4_LLWG_ERCOT_Batch_Study_Update_20260424 · Meeting Agenda
- 5. LCL Power Variation Limit and Monitoring Requirement: Need and Discussion — Jimmy Zhang & Jonathan Rose (ERCOT) · 10:50am
-
6.
LCL Frequency Limit Study Update
— Luis Hinojosa (ERCOT)
· 11:45 am
- LLWG_LCL_Frequency_Limit_Study_Update_04242026 · Staff Report
- 7. Lunch · 12:15 pm
- 8. Large Load Modeling – PGRR144 — Sun Wook Kang (ERCOT) · 1:00 pm
- 9. Grid-Safe Data Centers: VRT and Ramp-Rate Compliance via Medium Voltage AI UPS™ — Ricardo De Azevedo (On.Energy) · 1:45 pm
- 10. De-Risking IBR and Large Load Commissioning Using Hardware-in-the-Loop Testing, Live Demonstration of Data Center and IBR Test Bed: AI Load Impact on Generator Shaft Dynamics and Mitigation with Battery Energy Storage — Sam Maleki & Arman Ghasai (EdgeTunePower) · 2:15 pm
- 11. 800VDC Power Architecture Solution for LVRT & LEL Fluctuations — Ian Wright (Dimaag-AI) · 3:00 pm
- Adjourn · 3:30 pm
Documents 2
| Name | Doc Type | Type | Posted |
|---|---|---|---|
| EdgeTunePower_ERCOT presentation_LLWG_April_24th_2026 | Stakeholder Presentation | pptx | Apr 23 '26 |
| April 24 LLWG Report_042426 | Committee Report | pptx | Apr 24 '26 |