ERCOT·WATCH Search ercot.com  ⌕
VCMRR #7 · Revision Request

VCMRR007  Alignment with NPRR699, Energy Offer Curve Caps for Make-Whole Calculations for Resource Type Other

Approved sponsor RCWG posted 2015-04-29 ercot.com
ReasonAddresses current operational issues.
Created2015-06-03
Sections Affected
Appendix 10
Summary
NPRR699 revises paragraph (1)(l) in Protocol Section 4.4.9.2.3, Energy Offer Curve Validation, to specify the cap for Make-Whole Payments for all Resources categorized as Other. This Verifiable Cost Manual Revision Request (VCMRR) removes from the manual references to the cap for Energy Storage Resources as this would be inconsistent with the provision added to Protocols by NPRR699.
Action Log 3 milestones
Documents 5
NameTypePostedClassification
007VCMRR-01 Alignment with NPRR699, Energy Offer Curve Caps for Make Whole Calculations for Res Type Other 042915 doc Apr 29 '15 Revision Request
007VCMRR-02 WMS Report 060315 doc Jun 5 '15 Committee Report
007VCMRR-03 Impact Analysis 061015 doc Jun 10 '15 Staff Report
007VCMRR-04 TAC Report 073015 doc Aug 3 '15 Committee Report
007VCMRR-05 TAC Report 082715 doc Aug 27 '15 Committee Report
Meetings That Took It Up 4
DateMeetingCommitteeStatus
Aug 27 '15 TAC Meeting TAC Concluded
Jul 30 '15 TAC Meeting TAC Concluded
Jun 3 '15 WMS Meeting WMS Concluded
May 6 '15 WMS Meeting WMS Concluded