SMOGRR #27 · Revision Request
SMOGRR027 Move OBD to Settlement Metering Operating Guide – EPS Metering Design Proposal
- WMS Feb 7 '24
- TAC Feb 14 '24
- BOARD Feb 27 '24
- PUCT Apr 11 '24
ReasonGeneral system and/or process improvement(s)
Created2023-09-06
Approved2024-04-11
Sections Affected
3.4 and 12 Attachment A (new)
Summary
This Settlement Metering Operating Guide Revision Request (SMOGRR) moves the EPS Metering Design Proposal from the Other Binding Document List into the Settlement Metering Operating Guide to standardize the approval process, and amends the design proposal form to require additional information identifying any and all Distribution Service Providers (DSPs) that have the right to serve a project. The amendments also make clear that this requirement does not apply to Wholesale Storage Load (WSL), and deletes references to the Resource Asset Registration Form (RARF) in the ERCOT-Polled Settlement (EPS) Metering Design Proposal form.
Timeline
- Aug 9
-
Sep 6
WMS WMS MeetingWMSDeferred/Tabled Referred → MWG“to table SMOGRR027 and refer the issue to the Metering Working Group (MWG)” — Passed→ Language Consideration
- Sep 13
-
Oct 11
Listed without action at 6 meetings (Oct 11 '23 – Dec 4 '23)
- Dec 6
-
Dec 12
Listed without action at 1 meeting
-
Jan 10
WMS WMS MeetingWMSRecommended for Approval Amended by the Dec 5 '23 ERCOT comments“to recommend approval of SMOGRR027 as amended by the 12/5/23 ERCOT comments” — Passed→ Revision Request Consideration
- Jan 24
-
Feb 7
WMS WMS MeetingWMSRecommended for Approval Forwarded → TAC“to endorse and forward to TAC the 1/10/24 WMS Report and 9/8/23 Impact Analysis for SMOGRR027” — Passed→ Revision Request Consideration
-
Feb 14
TAC TAC MeetingTACRecommended for Approval“to recommend approval of SMOGRR027 as recommended by WMS in the 2/7/24 WMS Report” — Passed→ Revision Request Consideration
-
Feb 27
BOARD Board of Directors MeetingBOARDRecommended for Approval“to recommend approval of SMOGRR027 as recommended by TAC in the 2/14/24 TAC Report” — Passed→ Revision Request Consideration
-
Apr 11
PUCTPUCTApproved“to approve SMOGRR027 and accompanying ERCOT Market Impact Statement as presented in Project No. 54445, Review of Protocols Adopted by the Independent Organization” — Passed
-
—
Posted since the last meeting