ERCOT·WATCH Search ercot.com  ⌕
SMOGRR #18 · Revision Request

SMOGRR018  EPS Metering for Three-Wire Wye Configurations

Approved sponsor TIEC posted 2016-08-29 ercot.com
ReasonAddresses current operational issues
Created2016-09-22
Sections Affected
1.3.21.4.1
Summary
This Settlement Metering Operating Guide Revision Request (SMOGRR) allows an ERCOT-Polled Settlement (EPS) Meter to be installed for a facility that is connected to a three-wire wye, high or low impedance grounded distribution system, if the high or low impedance ground is installed as part of a fault monitoring system for the facility and no phase to ground loads or phase to ground sources are connected behind the metering point.
Action Log 4 milestones
Documents 6
NameTypePostedClassification
018SMOGRR-01 EPS Metering for Three Wire Wye Configurations 082916 doc Aug 29 '16 Revision Request
018SMOGRR-02 MWG Report 092216 doc Sep 23 '16 Committee Report
018SMOGRR-03 Impact Analysis 092816 doc Sep 28 '16 Committee Report
018SMOGRR-04 MWG Report 102016 doc Oct 20 '16 Committee Report
018SMOGRR-05 WMS Report 110216 doc Nov 3 '16 Committee Report
018SMOGRR-06 TAC Report 120116 doc Dec 5 '16 Committee Report
Meetings That Took It Up 3
DateMeetingCommitteeStatus
Dec 1 '16 TAC Meeting TAC Concluded
Nov 2 '16 WMS Meeting WMS Concluded
Sep 22 '16 MWG WebEx Meeting MWG Concluded