SMOGRR #18 · Revision Request
SMOGRR018 EPS Metering for Three-Wire Wye Configurations
ReasonAddresses current operational issues
Created2016-09-22
Sections Affected
1.3.21.4.1
Summary
This Settlement Metering Operating Guide Revision Request (SMOGRR) allows an ERCOT-Polled Settlement (EPS) Meter to be installed for a facility that is connected to a three-wire wye, high or low impedance grounded distribution system, if the high or low impedance ground is installed as part of a fault monitoring system for the facility and no phase to ground loads or phase to ground sources are connected behind the metering point.
Action Log 4 milestones
-
Sep 22
MWGRecommended for Approval→ MWG for Impact Analysis review
-
Oct 20
MWGRecommended for Approval→ WMS for consideration
-
Nov 2
WMSRecommended for Approval→ TAC for consideration
-
Dec 1
TACApproved
Documents 6
| Name | Type | Posted | Classification |
|---|---|---|---|
| 018SMOGRR-01 EPS Metering for Three Wire Wye Configurations 082916 | doc | Aug 29 '16 | Revision Request |
| 018SMOGRR-02 MWG Report 092216 | doc | Sep 23 '16 | Committee Report |
| 018SMOGRR-03 Impact Analysis 092816 | doc | Sep 28 '16 | Committee Report |
| 018SMOGRR-04 MWG Report 102016 | doc | Oct 20 '16 | Committee Report |
| 018SMOGRR-05 WMS Report 110216 | doc | Nov 3 '16 | Committee Report |
| 018SMOGRR-06 TAC Report 120116 | doc | Dec 5 '16 | Committee Report |
Meetings That Took It Up 3
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Dec 1 '16 | TAC Meeting | TAC | Concluded |
| Nov 2 '16 | WMS Meeting | WMS | Concluded |
| Sep 22 '16 | MWG WebEx Meeting | MWG | Concluded |