SMOGRR018 EPS Metering for Three-Wire Wye Configurations
- WMS Nov 2 '16
- TAC Dec 1 '16
- BOARD —
- PUCT —
ReasonAddresses current operational issues
Created2016-09-22
Sections Affected
1.3.21.4.1
Summary
This Settlement Metering Operating Guide Revision Request (SMOGRR) allows an ERCOT-Polled Settlement (EPS) Meter to be installed for a facility that is connected to a three-wire wye, high or low impedance grounded distribution system, if the high or low impedance ground is installed as part of a fault monitoring system for the facility and no phase to ground loads or phase to ground sources are connected behind the metering point.
Timeline
- Aug 29
-
Sep 22
MWG MWG WebEx MeetingMWGRecommended for Approval“To recommend approval of SMOGRR018 as submitted” — Passed→ MWG for Impact Analysis review
-
Oct 20
MWGEmail Vote / Unlisted MeetingMWGRecommended for Approval Forwarded → WMS“To endorse and forward to WMS the 9/22/16 MWG Report and Impact Analysis for SMOGRR018” — Passed→ WMS for consideration
-
Nov 2
WMS WMS MeetingWMSRecommended for Approval“To recommend approval of SMOGRR018 as recommended by MWG in the 10/20/16 MWG Report” — Passed→ TAC for consideration
-
Dec 1
TAC TAC MeetingTACApproved“To approve SMOGRR018 as recommended by WMS in the 11/2/16 WMS Report” — Passed
-
—