ERCOT·WATCH Search ercot.com  ⌕
SMOGRR #4 · Revision Request

SMOGRR004  SMOG Reformat and Update

Approved sponsor MWG posted 2005-12-02 ercot.com
ReasonBring the Settlement Metering Operating Guide in conformance with proper formatting and style conventions and create internal consistency as well consistency with the ERCOT Protocol and operating guide documents and processes.
Created2006-01-18
Sections Affected
- Commercial Operations: Settlement Metering Operating Guides. - Attachment A: Failure of EPS Communications Facilities. - Attachment B: Documentation for EPS Metering Facilities. - Attachment C: EPS Meter Configuration Criteria - Attachment D: General Standards for Metering Facilities. - Attachment E: Transformer and Line Loss Compensation Factors. - Attachment F: Data ValidationEstimation and Editing Procedures.
Summary
This revision edits the Settlement Metering Operating Guide to implement proper formatting and style conventions and clarify or correct existing language. The revision also changes the Attachments to Sections, while retaining the original titles, and introduces a table of contents. Substantive changes are the elimination of the requirement for annual CT burden test if a written explanation is received by ERCOT. Additionally, the requirement for meter event logging and reporting were changed and event definitions were added.
Action Log 2 milestones
Documents 5
NameTypePostedClassification
004SMOGRR-01 SMOG Reformat and Update 120205 doc Dec 2 '05 Revision Request
004SMOGRR-02 MWG Recommendation Report 120505 doc Dec 8 '05 Committee Report
004SMOGRR-03 WMS Recommendation Report 011806 doc Jan 20 '06 Committee Report
004SMOGRR-04 Impact Analysis 012706 doc Jan 27 '06 Staff Report
004SMOGRR-05 TAC Action Report 020206 doc Feb 6 '06 Committee Report
Meetings That Took It Up 3
DateMeetingCommitteeStatus
Feb 2 '06 TAC Meeting TAC Concluded
Jan 18 '06 WMS Meeting WMS Concluded
Dec 5 '05 MWG Meeting MWG Concluded