SCR795  Addition of Intra-Hour Wind Forecast to GTBD Calculation

Approved sponsor ERCOT posted 2017-11-28 ercot.com
ReasonMarket efficiencies or enhancements
Created2017-12-14
Approved2018-04-10
Sections Affected
6.5.7.3
Summary
ERCOT is in the process of adding an intra-hour wind forecast. This System Change Request (SCR) updates the formula used by the Resource Limit Calculator to calculate the Generation To Be Dispatched (GTBD) value to include the addition of a predicted 5-minute wind ramp (PWRR). This PWRR will be calculated from the intra-hour wind forecast times five and a configurable factor to capture the forecasted 5-minute wind ramp. This addition would help Security-Constrained Economic Dispatch (SCED) take into account the potential 5-minute wind ramp in its 5-minute Base-Points and would take the burden off of Regulation to cover the 5-minute gain or loss of generation from variations in wind and instead dispatch this energy economically. This change will also aid reducing frequency recovery duration following events that occur during times with significant wind up and down ramps. Although there will be inherent forecast error in the intra-hour forecast, this change will give a better indication to SCED via GTBD of the level of wind generation that will be available in the next 5 minutes, as compared to the current assumption that the wind generation will persist at the same level as at the beginning of the 5-minute interval. Once ERCOT begins to receive the intra-hour wind forecast from its vendor(s), ERCOT will analyze the 5-minute out forecast performance and accuracy of projected wind generation ramp direction before the intra hour wind forecast component is activated in the GTBD formula.
Action Log 5 milestones
Documents 10
NameTypePostedClassification
795SCR-01 Addition of Intra Hour Wind Forecast to GTBD Calculation 112817 doc Nov 28 '17 Revision Request
795SCR-02 Impact Analysis 112817 doc Nov 28 '17 Staff Report
795SCR-03 PRS Report 121417 doc Dec 15 '17 Committee Report
795SCR-04 WMS Comments 011118 doc Jan 11 '18 Revision Request Comments
795SCR-05 ROS Comments 011218 doc Jan 12 '18 Revision Request Comments
795SCR-06 ROS Comments 020518 doc Feb 5 '18 Revision Request Comments
795SCR-07 PRS Report 020818 doc Feb 13 '18 Committee Report
795SCR-08 PRS Report 030818 doc Mar 12 '18 Committee Report
795SCR-09 TAC Report 032218 doc Mar 23 '18 Committee Report
795SCR-10 Board Report 041018 doc Apr 11 '18 Committee Report
Meetings That Took It Up 14
DateMeetingCommitteeStatus
Oct 22 '18 PDCWG Meeting PDCWG Concluded
Apr 10 '18 Board of Directors Meeting BOARD Concluded
Mar 22 '18 TAC Meeting TAC Concluded
Mar 19 '18 QMWG Meeting QMWG Concluded
Mar 8 '18 PRS Meeting PRS Concluded
Feb 28 '18 WMS Meeting WMS Concluded
Feb 13 '18 QMWG Meeting QMWG Concluded
Feb 8 '18 PRS Meeting PRS Concluded
Feb 1 '18 ROS Meeting ROS Concluded
Jan 31 '18 WMS Meeting WMS Concluded
Jan 18 '18 PRS Meeting PRS Concluded
Jan 11 '18 ROS Meeting ROS Concluded
Jan 10 '18 WMS Meeting WMS Concluded
Dec 14 '17 PRS Meeting PRS Concluded