SCR #788 · Revision Request

SCR788  Addition of Integral ACE Feedback to GTBD Calculation

Approved sponsor Mike Noth on behalf of the Performance, Disturbance, Compliance Working Group (PDCWG) posted 2016-02-01 ercot.com
ReasonMarket efficiencies or enhancements
Created2016-03-10
Approved2016-06-14
Summary
This System Change Request (SCR) updates the formula used by the Resource Limit Calculator to calculate the Generation To Be Dispatched (GTBD) value. The update will include the addition of Area Control Error (ACE) Integral times a configurable factor that captures the long-term Dispatch trend to help minimize GTBD oscillations from one Security-Constrained Economic Dispatch (SCED) interval to the next. The analysis further shows that having an Integral ACE feedback would reduce the amount of manual Time Error corrections performed. Integral ACE is calculated from Raw ACE by integrating the raw ACE value over a configurable amount of time (X seconds) and adding it to the previous 4 second Integral ACE, as shown below: Integral ACE (current 4 sec) = Integral ACE(last 4 sec) + [(Raw ACE(Current 4 sec)*(Current Time – Last AGC run time))/X] In general, Integral ACE provides a good indication of which direction ACE has been trending.
Action Log 4 milestones
Documents 6
NameTypePostedClassification
788SCR-01 Addition of Integral ACE Feedback to GTBD Calculation 020116 doc Feb 1 '16 Revision Request
788SCR-02 PRS Report 031016 doc Mar 11 '16 Committee Report
788SCR-03 Impact Analysis 040616 doc Apr 6 '16 Staff Report
788SCR-04 PRS Report 041416 doc Apr 18 '16 Committee Report
788SCR-05 TAC Report 042816 doc Apr 29 '16 Committee Report
788SCR-06 Board Report 061416 doc Jun 15 '16 Committee Report
Meetings That Took It Up 6
DateMeetingCommitteeStatus
Oct 14 '16 QMWG Meeting QMWG Concluded
Jun 14 '16 Board of Directors Meeting BOARD Concluded
Apr 28 '16 TAC Meeting TAC Concluded
Apr 14 '16 PRS Meeting PRS Concluded
Apr 6 '16 WMS Meeting WMS Concluded
Mar 10 '16 PRS Meeting PRS Concluded