SCR #759 · Revision Request
SCR759 acLineSegment Name Length Increase in Information Model Manager
- PRS Aug 19 '10
- TAC Sep 2 '10
- BOARD Sep 21 '10
- PUCT —
ReasonMulti-section line models have been used by transmission planners in Siemens Power System Simulator for Engineering (PSSE) power flow software for over 20 years as a tool for correctly simulating contingencies on the ERCOT System for planning studies. The Topology Processor enhancement approved by ERCOT in April 2010 to add multi-section line definitions to the raw file output requires all line segments of the multi-section line to be modeled under the same Line Equipment Container in the Network Operations Model. The reason that some Transmission Service Providers (TSPs) are not modeling line segments in this manner in the Information Model Manager is that the acLineSegment name is currently limited to two characters, which is too limiting for many TSPs line segment IDs. To be able to make this change to the Network Operations Model, the acLineSegment name must be increased. If this increased name size is not changed, the multi-section line functionality of the Topology Processor cannot be utilized.
Created2010-07-15
Approved2010-09-21
Sections Affected
N/A
Summary
This System Change Request (SCR) proposes to increase the allowable character size of the acLineSegment type under the Line Equipment Container from two to 14 in the Information Model Manager.
Timeline
- May 27
-
Jul 15
ROS ROS MeetingROSRecommended for Approval“To recommend approval of SCR759 as submitted.” — Passed→ ROS Impact Analysis review
-
Aug 12
ROS ROS MeetingROSRecommended for Approval Forwarded → TAC Priority“To endorse and forward the 7/15/10 ROS Report and Impact Analysis for SCR759 to TAC with a recommended priority of High.” — Passed→ PRS priority assignment
-
Aug 19
PRS PRS MeetingPRSRecommended for Approval Priority“To recommend a priority of High for SCR759.” — Passed→ TAC consideration of SCR759
-
Sep 2
TAC TAC MeetingTACRecommended for Approval Priority“To recommend approval of SCR759 as recommended by PRS in the 8/19/10 PRS Report with a priority of High.” — Passed→ ERCOT Board consideration of SCR759
-
Sep 21
BOARDEmail Vote / Unlisted MeetingBOARDApproved“To approve SCR759 as recommended by TAC in the 9/2/10 TAC Report.” — Passed→ Parking Deck - Impact Analysis and budget review
- Dec 15