ERCOT·WATCH Search ercot.com  ⌕
SCR #725 · Revision Request

SCR725  ERCOT Settlement Estimation Transparency

Approved sponsor TXU posted 2002-09-17 ercot.com
ReasonQSEs are bearing the financial exposure from any inaccuracy in the estimation of load as a result of missing metered volumes at ERCOT. Better transparency concerning the amount of load estimation involved in the production of ERCOT Settlement statements “ both for the ERCOT-wide market settlement and their by Load calculations is needed. This will give QSEs better data with which to base their analysis of their own load exposure at True-up and the impact of estimation on their preliminary settlement statements.
Created2002-09-17
Summary
With each Settlement Statement, ERCOT must provide information regarding the Load estimation required because of missing metered volumes. Information for ERCOT-wide estimation, represented REPs estimation, and their specific QSEs estimation.
Documents 2
NameTypePostedClassification
ERCOT Settlement Estimation doc Jul 26 '04 Revision Request
Occidental Comments doc Jul 26 '04 Revision Request Comments