ERCOT·WATCH Search ercot.com  ⌕
RMGRR #60 · Revision Request

RMGRR060  Mandatory IDR Installation Process

Approved sponsor Texas SET Working Group posted 2007-12-05 ercot.com
ReasonThis revision is being submitted to bring the RMG mandatory IDR install process in synch with Protocol Section 18.6.1.
Created2008-01-09
Sections Affected
7.13.2.2
Summary
Protocol Section 18.6.1 mandates installation of an IDR for specific ESI IDs once the mandatory requirements criteria have been met, however the Retail Market Guide (RMG) Section 7.13.2.2 provides an optional process by using the word "may" creating a gap and a conflict between the two documents for the same process. This Retail Market Guide Revision Request (RMGRR) is being submitted to close the gap and remove the conflicting information between Protocol Section 18.6.1 and RMG Section 7.13.2.2.
Action Log 3 milestones
Amendments
DateBodyMotionResult
Jan 9 '08RMS To recommend approval of RMGRR060 as revised by RMS.Passed
Documents 5
NameTypePostedClassification
060RMGRR-01 Mandatory IDR Installation Process 120507 doc Dec 5 '07 Revision Request
060RMGRR-02 RMS Recommendation Report 010908 doc Jan 9 '08 Committee Report
060RMGRR-03 Impact Analysis 013108 doc Jan 31 '08 Staff Report
060RMGRR-04 RMS Recommendation Report 021308 doc Feb 20 '08 Committee Report
060RMGRR-05 TAC Action Report 030608 doc Mar 7 '08 Committee Report
Meetings That Took It Up 4
DateMeetingCommitteeStatus
Mar 6 '08 TAC Meeting TAC Concluded
Feb 13 '08 RMS Meeting RMS Concluded
Jan 22 '08 Texas SET Work Group Meeting TXSET Concluded
Jan 9 '08 RMS Meeting RMS Concluded