NPRR #707 · Revision Request

NPRR707  Provision of Transmission System Voltage Telemetry to QSEs

Withdrawn sponsor Luminant posted 2015-05-22 ercot.com
ReasonRegulatory requirements
Created2015-06-11
Sections Affected
3.10.7.5.2
Summary
This Nodal Protocol Revision Request (NPRR) requires ERCOT to provide, upon request, transmission system voltage at each Generation Resource Point of Interconnection (POI) to the transmission system through telemetry via Inter-Control Center Communications Protocol (ICCP). This is necessary for the Generation Resource to comply with the latest version of North American Electric Reliability Corportation (NERC) Standard VAR-002-3, Generator Operation for Maintaining Network Voltage Schedules. Paragraph R2, 2.3, requires generation operators to monitor the voltage at the location specified in their voltage schedule. This data is readily available from ERCOT and provision of this data should not violate any of the provisions of Nodal Protocol Section 1.3, Confidentiality.
Action Log 1 milestones
Documents 4
NameTypePostedClassification
707NPRR-01 Provision of Transmission System Voltage Telemetry to QSEs 052215 doc May 22 '15 Revision Request
707NPRR-02 ERCOT Comments 060915 doc Jun 9 '15 Revision Request Comments
707NPRR-03 PRS Report 061115 doc Jun 15 '15 Committee Report
707NPRR-04 Request for Withdrawal 090915 doc Sep 9 '15 Revision Request Comments
Meetings That Took It Up 7
DateMeetingCommitteeStatus
Oct 5 '15 Voltage Profile Working Group (VPWG) Meeting VPWG Concluded
Sep 10 '15 PRS Meeting PRS Concluded
Aug 13 '15 PRS Meeting PRS Concluded
Jul 21 '15 NDSWG Meeting NDSWG Concluded
Jul 16 '15 PRS Meeting PRS Concluded
Jul 9 '15 ROS Meeting ROS Concluded
Jun 11 '15 PRS Meeting PRS Concluded