NPRR #627 · Revision Request
NPRR627 Augmented ORDC to Include Reliability Factor Methodology
ReasonMarket efficiencies or enhancements.
Created2014-06-11
Rejected2014-07-17
Sections Affected
6.5.7.3
Summary
The Nodal Protocol Revision Request (NPRR) introduces the reliability factor which will be used to augment the ORDC to place a higher value on Real-Time operating reserves during defined periods of increased system risk to adequately price the increased risk; and provides the process for modifying the methodology used to determine the reliability factor. The price after the addition of the Real-Time On-Line Reserve Price Adder to Locational Marginal Prices (LMPs) approximates the pricing outcome of Real-Time energy and Ancillary Service co-optimization since the Real-Time On-Line Reserve Price Adder captures the value of the opportunity cost of reserves based on the defined ORDC and adjusted for the reliability factor. The reliability factor methodology requires ERCOT to provide advance notice prior to modifying the reliability factor for an Operating Day and advance posting of the reliability factor for the applicable Operating Day to the Market Information System (MIS). The timing values are represented as "X" and will be determined through the stakeholder process prior to approval of this NPRR.
Action Log 2 milestones
-
Jun 11
PRSDeferred/Tabled→ PRS for consideration.
-
Jul 17
PRSRejected
Documents 5
| Name | Type | Posted | Classification |
|---|---|---|---|
| 627NPRR-01 Augmented ORDC to Include Reliability Factor Methodol | doc | May 19 '14 | Revision Request |
| 627NPRR-02 PRS Report 061114 | doc | Jun 16 '14 | Committee Report |
| 627NPRR-03 WMS Comments 071114 | doc | Jul 11 '14 | Revision Request Comments |
| 627NPRR-04 PRS Report 071714 | doc | Jul 22 '14 | Committee Report |
| 627NPRR-05 PRS Voting Ballot 071714 | xls | Jul 21 '14 | Revision Request Ballot |
Meetings That Took It Up 6
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Aug 28 '14 | TAC Meeting | TAC | Concluded |
| Jul 31 '14 | TAC Meeting | TAC | Concluded |
| Jul 17 '14 | PRS Meeting | PRS | Concluded |
| Jul 9 '14 | WMS Meeting | WMS | Concluded |
| Jun 11 '14 | PRS Meeting | PRS | Concluded |
| May 29 '14 | TAC Workshop: Review of ORDC Impact and Price Reversal Concerns re ERS/Load acting as Responsive Reserve/RUC | TAC | Concluded |