NPRR623  Measurement and Evaluation of ERS

Withdrawn sponsor Good Company Associates posted 2014-05-08 ercot.com
ReasonAddresses current operational issues. Administrative Regulatory requirements Other: Clarifies ability of ERCOT to use available data to measure output /contribution of Resources in a configuration not fully anticipated in the Protocols.
Created2014-06-11
Sections Affected
3.14.3.38.1.3.1.28.1.3.1.4
Summary
This Nodal Protocol Revision Request (NPRR) proposes minor technical modification to the Protocols to explicitly account for the possibility that an ERS Load, and the ERS Generation located behind the same Point of Interconnection (POI) to the ERCOT Transmission Grid, can both jointly, or independently, provide ERS services and be evaluated appropriately, regardless of the operating characteristics of the industrial facility and its ERS baseline assignment.
Action Log 1 milestones
Documents 4
NameTypePostedClassification
623NPRR-01 Measurement and Evaluation of ERS 050814 doc May 8 '14 Revision Request
623NPRR-02 ERCOT Comments 051414 doc May 14 '14 Revision Request Comments
623NPRR-03 PRS Report 061114 doc Jun 16 '14 Committee Report
623NPRR-04 Request for Withdrawal 070214 doc Jul 2 '14 Revision Request Comments
Meetings That Took It Up 3
DateMeetingCommitteeStatus
Jul 17 '14 PRS Meeting PRS Concluded
Jun 11 '14 PRS Meeting PRS Concluded
May 15 '14 PRS Meeting PRS Concluded