NPRR #582 · Revision Request

NPRR582  Refinements to Testing ERS

Rejected sponsor Edison Mission posted 2013-11-13 ercot.com
ReasonERS requires participating Loads to meet availability and performance requirements. ERCOT tests ERS and this testing reduces Load on the ERCOT System thereby potentially impacting price formation. The expansion of ERS to include weather sensitive Loads, which may be available only over peak periods, could result in unintended consequences if testing occurs over peak periods. By limiting the MW that can be tested at a particular time, this NPRR ensures that testing, even if over peak, will not have a tremendously adverse effect on Real-Time price formation. Testing ERS is different than testing Generation Resources because testing Generation Resources does not change the overall amount of Load on the ERCOT System. Testing ERS reduces the overall Load on the ERCOT System.
Created2013-12-19
Rejected2014-02-13
Sections Affected
8.1.3.1.2
Summary
This Nodal Protocol Revision Request (NPRR) establishes a limit on the number of MW that ERCOT can test for Emergency Response Service (ERS) at any particular point in time. As ERS grows in MW, types, distribution, and use by ERCOT, the potential impact created by testing ERS grows. The intent of this NPRR is to balance the needs for testing to validate parameters for ERS as set forth in the Protocols and Other Binding Documents, while recognizing that ERCOT-instructed interruption of Load for testing purposes can impact Real-Time energy price formation.
Action Log 2 milestones
Documents 5
NameTypePostedClassification
582NPRR-01 Refinements to Testing ERS 111313 doc Nov 13 '13 Revision Request
582NPRR-02 ERCOT Comments 121813 doc Dec 18 '13 Revision Request Comments
582NPRR-03 PRS Report 121913 doc Dec 20 '13 Committee Report
582NPRR-04 WMS Comments 020514 doc Feb 6 '14 Revision Request Comments
582NPRR-05 PRS Report 021314 doc Feb 17 '14 Committee Report
Meetings That Took It Up 6
DateMeetingCommitteeStatus
Feb 27 '14 TAC Meeting TAC Concluded
Feb 13 '14 PRS Meeting PRS Concluded
Feb 5 '14 WMS Meeting WMS Concluded
Jan 16 '14 PRS Meeting PRS Concluded
Jan 8 '14 WMS Meeting WMS Concluded
Dec 19 '13 Protocol Revision Subcommittee (PRS) Meeting PRS Concluded