NPRR #409 · Revision Request

NPRR409  Outage Planning Criteria Clarifications and Enhancements to Narrow Gap Between Real-Time Operations and Outage Planning

Withdrawn sponsor Luminant Energy posted 2011-09-07 ercot.com
ReasonThe ERCOT Technical Advisory Committee (TAC) directed the Planning Working Group (PLWG) of the Reliability and Operating Subcommittee (ROS) to develop planning processes that eliminate the gap between operations and planning in order to significantly reduce the amount of unmanageable constraints that have been observed in Real-Time operations. It is recognized that unmanageable constraints in Real-Time can arise for a variety of reasons, only some of which may be improved with these outage planning recommendations; while many of the others may be improved with transmission planning enhancements. The language changes contained in this NPRR represent the modifications to the transmission planning process discussed by the Joint PLWG/Congestion Management Working Group (CMWG) and apply them in a complementary fashion to the Outage planning process that aligns with PGRR011.
Created2011-09-22
Sections Affected
2.12.23.1.5.11
Summary
This NPRR adds a new definition of Outage Planning Contingencies to be consistent with NOGRR078 and PGRR011. This NPRR also revises factors used by ERCOT to evaluate requests for Generation and Transmission Outages received from Market Participants to allow for 90th percentile variation of weather driven Load, generation availability, and transmission line ratings of dynamically rated lines. This NPRR ensures that Outage planning studies do not double count generation capacity as being available simultaneously for both congestion management and Ancillary Services including Responsive Reserve (RRS), Regulation Up (Reg-Up), and Non-Spinning Reserve (Non-Spin), unless ERCOT Operations has processes in place to allow for location specific deployment of the Ancillary Service reserves for congestion management purposes. Finally, this NPRR ensures that, if in Real-Time operations ERCOT determines that a generic constraint definition and associated transfer limit(s) is required for secure operation of the ERCOT System, then this same generic constraint shall be similarly modeled in Outage planning studies.
Action Log 1 milestones
Documents 7
NameTypePostedClassification
409NPRR-01 Outage Planning Criteria Clarifications and Enhanceme doc Sep 7 '11 Revision Request
409NPRR-02 Urgency Vote Ballot 090911 xls Sep 9 '11 Revision Request Ballot
409NPRR-03 ROS Comments 091611 doc Sep 16 '11 Revision Request Comments
409NPRR-04 PRS Report 092211 doc Sep 27 '11 Committee Report
409NPRR-05 ERCOT Comments 101411 doc Oct 14 '11 Revision Request Comments
409NPRR-06 ROS Comments 111511 doc Nov 15 '11 Revision Request Comments
409NPRR-07 Request for Withdrawal 111511 doc Nov 15 '11 Revision Request Comments
Meetings That Took It Up 7
DateMeetingCommitteeStatus
Nov 17 '11 PRS Meeting PRS Concluded
Nov 10 '11 ROS Meeting ROS Concluded
Oct 21 '11 Special ROS Meeting/Workshop - Coordination of Operations and Planning Environments ROS Concluded
Oct 20 '11 PRS Meeting PRS Concluded
Oct 13 '11 ROS Meeting ROS Concluded
Sep 22 '11 PRS Meeting PRS Concluded
Sep 15 '11 ROS Meeting ROS Concluded