NPRR #371 · Revision Request

NPRR371  Telemetered LSL for QSGR

Withdrawn Urgent sponsor Topaz Power posted 2011-05-31 ercot.com
ReasonQSGRs are receiving Base Points below the physical LSL in the first SCED interval prior to reaching their physical LSL in start-up. Because the current Protocols require the Resource to telemeter a value less than or equal to the actual output level until reaching the physical LSL, SCED can, and does, issue Base Points of zero to QSGRs in the subsequent execution. This has caused up to 13 starts in one day. The financial and operational impact of this circumstance was not anticipated during the drafting of NPRR272, Definition and Participation of Quick Start Generation Resources. The duration and frequency of resulting start-ups may cause QSGRs to be unavailable due to maintenance requirements.
Created2011-06-23
Sections Affected
3.8.3
Summary
This Nodal Protocol Revision Request (NPRR) will allow QSGRs to immediately telemeter the physical Low Sustained Limit (LSL) upon a SCED energy deployment.
Action Log 1 milestones
Documents 6
NameTypePostedClassification
371NPRR-01 Telemetered LSL for QSGR 053111 doc May 31 '11 Revision Request
371NPRR-02 Urgency Vote Ballot 060211 xls Jun 2 '11 Revision Request Ballot
371NPRR-03 ERCOT Comments 061511 doc Jun 15 '11 Revision Request Comments
371NPRR-04 PRS Report 062311 doc Jun 29 '11 Committee Report
371NPRR-05 WMS Comments 071811 doc Jul 18 '11 Revision Request Comments
371NPRR-06_Request_for_Withdrawal_100311 doc Oct 3 '11 Revision Request Comments
Meetings That Took It Up 11
DateMeetingCommitteeStatus
Oct 20 '11 PRS Meeting PRS Concluded
Sep 22 '11 PRS Meeting PRS Concluded
Sep 14 '11 WMS Meeting WMS Concluded
Sep 8 '11 QMWG Meeting QMWG Concluded
Aug 18 '11 PRS Meeting PRS Concluded
Aug 10 '11 WMS Meeting WMS Concluded
Aug 8 '11 QMWG Meeting QMWG Concluded
Jul 21 '11 PRS Meeting PRS Concluded
Jul 13 '11 WMS Meeting WMS Concluded
Jul 11 '11 QMWG Meeting QMWG Concluded
Jun 23 '11 PRS Meeting PRS Concluded