NPRR #1336 · Revision Request
NPRR1336 Language Clean-up for NPRR1188 Implementation
ReasonGeneral system and/or process improvement(s)
Created2026-06-10
Sections Affected
6.5.7.46.6.3.16.6.7.111.1.6
Summary
This Nodal Protocol Revision Request (NPRR) corrects language related to the implementation of NPRR1188, Implement Nodal Dispatch and Energy Settlement for Controllable Load Resources. Specific changes include: aligning language with Real-Time Co-optimization plus Batteries (RTC+B) implementation, replacing Updated Desired Base Points with Updated Desired Set Points (UDSPs), in Section 6.5.7.4; correcting a Controllable Load Resource (CLR) meter price formula in Section 6.6.3.1; clarifying the consideration of Unaccounted For Energy (UFE) in bill determinants in Section 6.6.3.1; aligning MEBR variable definitions across Section 6.6.7.1; clarifying the Settlement of calculated auxiliary Load for an Energy Storage Resource (ESR) that is not separately measured in paragraph (5) of Section 11.1.6; and other updates.
Action Log 1 milestones
-
Jun 10
PRSDeferred/Tabled→ Language Consideration
Ballots
| Date | Body | Result | Yes | No | Abstain | |
|---|---|---|---|---|---|---|
| Jun 10 '26 | PRS | Motion Carries | 7 | 0 | 0 | xls |
Documents 4
| Name | Type | Posted | Classification |
|---|---|---|---|
| 1336NPRR-01 Language Clean-up for NPRR1188 Implementation 052626 | docx | May 26 '26 | Revision Request |
| 1336NPRR-02 Impact Analysis 052626 | docx | May 26 '26 | Staff Report |
| 1336NPRR-03 PRS Ballot 061026 | xls | Jun 15 '26 | Revision Request Ballot |
| 1336NPRR-04 PRS Report 061026 | docx | Jun 15 '26 | Committee Report |
Meetings That Took It Up 2
| Date | Meeting | Committee | Status |
|---|---|---|---|
| Jul 15 '26 | PRS Meeting | PRS | Scheduled |
| Jun 10 '26 | PRS Meeting | PRS | Concluded |